3
F
I
E
D
GB
1- INTRODUCTION
• The equipment must be installed, started-up and maintained by authorised and qualified personnel, in accordance with local rules
and professional standards.
1.1 - GENERAL SUPPLY CONDITIONS
• Generally speaking, the material is transported at the consignee's risk.
• The consignee must immediately provide the carrier with written reserves if he finds any damage caused during transport.
1.2 - VOLTAGE
• Before carrying out any operation, check that the voltage indicated on the unit corresponds to the mains voltage.
1.3 - USE OF EQUIPMENT
• This equipment is intended for the air-conditioning of premises and to provide comfort for the personnel.
1.4 - CONDITIONS OF USE
• See the specifications in the 10 12 035 instructions, particularly to ensure correct selection of appliance.
• Reminder: Water circuit pressure: minimum: 1.5 bar (150 kPa),
maximum: 3 bar (300 kPa).
Materials:
- Plastic coated sheet body.
- Steel grids.
- Felt insulation.
- Copper/aluminium air evaporator.
- Copper/steel water condenser.
- Copper piping.
2 - PRESENTATION
2.1 - DESCRIPTION
1
- Discharge grille
2
- Removable panel
3
- Front panel
4
- Inlet grille
5
- Rear support
6
- Side panel
7
- Control panel
8
- Control knobs
9
- Door
10
- Fixed panel
19
- Water outlet
20
- Condensate drain pipe
21
- Fan
22
- Pressure tap Low Pressure
23
- Pressure tap High Pressure
24
- Flexible water pipes (supplied as
accessories)
25
- Power supply cable (except models
GTS and GT)
11
- Evaporator
12
- Electrical box
13
- Rotary switch
14
- Thermostat
15
- Hermetic compressor with sound
proofing
16
- Insulated water condenser
17
- Water inlet
18
- Pressostatic valve (for models with
town water)
17
24
19
18
23
16
14
15
13
11
21
20
22
AOV 85
13
14
15
16
17
23
18
24
21
19
20
12
11
AO (V) 15
AO (V) 25
1
2
3
4
10
7
6
5
8
9
21
20
24
19
23
18
17
13
14
15
16
22
11
12
AO (V) 55
12
Summary of Contents for AO 15 GTS
Page 14: ...62 F GB ...
Page 15: ...63 GB F ...