background image

 

 

 

3.0

 

Installation and Connection 

Product assembly and plumbing connection must be installed also by authorized person. 
Pellet stove is a full automatic device. Expansion tank, circulation pump, thermostat, safety valve, 
switch,  sensor and similar parts are located inside the stove safely. 
 

3.1.

 

  Electricity  

Electricity system should be 220V-230V/50Hz. Our company is not responsible for any problem which  
occur in case sudden low or high volt. 

Note: Keep plug of device on outlet during summer-winter. Protection freezing Works under +8 °C. 
It makes pump work 15-20 seconds for per 24 hours automatically to avoid lock pump. 
 

3.2.

 

Plumbing 

Technically, stove radiator plumbing connections should be made by an expert or qualified person to 
guarantee a correct operation. Our company is not responsible for any mistakes that will occur while 
installing and assemblying 
After taking all safety measures, main line pipes can be connected until last a few radiators with 
1”pipe(PVC or metal) without more elbow. Thus hot water can circulate easily, and so you feel heat in 
the shortest time. Later ¾ pipes(PVC or metal)can be used. 
Plumbing main line pipes should be connected to radiators safely with connection apparatus like 
assembly diagram.(record, valve, nipple). After connection, water is added with help of valve from 
point that is determined by expert. And later tightness must be controlled and taken air on radiators 
and valves. 
You should put antifreeze on plumbing against freezing and corrosion, according to climate 
conditions. 

 

3.3.

 

Chimney Connection

 

We advice steel chimney pipe for chimney connections. Pellet stove can be connected to multiple 
chimney. Chimney can be given outside directly according to place of stove. Or can be connected 
available chimney in short distance. 

 

Summary of Contents for TP-12

Page 1: ...tr TR 38070 KAYSERI T RKEI F 90 352 321 28 14 info teba com tr Installation Manuals Pellet Stove With Central Heating System Model TP 12 Tested according to DIN EN 13240 Tip BA 1 Please see enclosed...

Page 2: ...5 2 Heating Power Menu 12 4 5 3 Boiler Thermostat Menu 12 4 5 4 Buffer Thermostat Menu 12 4 5 5 Room Thermostat Menu 13 4 5 6 Remote Keyboard Menu 13 4 5 7 Chrono Menu 13 4 5 8 Modality 13 4 5 9 Progr...

Page 3: ...Suitable Fuel 16 17 5 2 Cleaning and Maintenance 17 5 2 1 Cleaning Fire Transition Pipes 17 5 2 2 Cleaning Combustion Box 18 6 0 General Warranty 18 6 1 Warranty Policies 18 6 2 Complaints 18 7 0 Inf...

Page 4: ...automatical and work with pellet fuel that is renewable energy source are produced And we got 90 efficiency In 2014 we started to sell in Turkey and abroad by producing all capacity You have a central...

Page 5: ...e Electronical control system Automatical ignition To set up of combusti on speed at 5 stage To keep the boiler water temperature at a requested temperature Remote Control system To blow air To connec...

Page 6: ...e put If the floor stove installed is flammable or heat sensitive you should place the product on a protection plate floor marble or glass substrate You should care about air condition for the area st...

Page 7: ...inhibits the passage of heat is put between stove and combustible materials Minimum distance combustible materials and furnitureis stated on the product label and must not be exceeded If the floor st...

Page 8: ...8 A B BACK WALL LATERAL WALL D FLOOR PROTECTION PLATE RADIATION AREA C E You can order floor protection plate from seller when you require...

Page 9: ...nsible for any mistakes that will occur while installing and assemblying After taking all safety measures main line pipes can be connected until last a few radiators with 1 pipe PVC or metal without m...

Page 10: ...10 4 0 Control Panel 4 1 Buttons 4 2 Leds Only for plumbing with Flow Switch...

Page 11: ...4 3 D splay 4 4 Errors...

Page 12: ...ows to set the system s combustion in automatic or manual mode in this case it is possible to set the combustion power 4 5 2 Heating Power Menu This Menu allows to manage the system s heating in autom...

Page 13: ...inguishing of the system by chrono choice the modality Daily Weekly or Week End to switch on and off the stove or boiler If a chrono modality is set on main frame appears the relating symbol D Daily W...

Page 14: ...able the desired mode Daily Weekly or Week End from Modality Menu 4 5 10 Time and Date Menu This Menu allows to set time and date Push the button P4 and P6 to select hours minutes year month and day P...

Page 15: ...nually the Auger or the brazier The loading stops automatically after 600 seconds The system has to be in Off State to do the loading NOTE when the auger is manually started the Exhaust Fan switches o...

Page 16: ...roximately 7 12 moisture Its calorie higher than wood since its moisture rate is low There are at least 3 steps while producing pellet Firstly wood wastes are made shavings by grinding after that they...

Page 17: ...not neccessary to connect to a chimney smoke can be given outside directly from its chimney output 5 2 Cleaning And Maintenance 5 2 1 Cleaning Fire Transition Pipes Fire transition pipes can be clean...

Page 18: ...your bill Pump glass faults on control board because of low or high voltaj wrong use are out of warranty If your product damages within warranty period our company will tries to resolve the dammage or...

Page 19: ...e parts provider Attention Stove place should not be changed Only advised and approved spart parts of manufacturer should be used In case of need please contact your dealer or provider After the publi...

Reviews: