CENTERING DEVICE, RBK-X1
Rev. 1
Jan. 2021
.
Page 10
3. Connection from Detection Unit to machine.
i.
Find the extension cable from package.
ii.
Connection the terminal end (7 point) to PLC (in machine right cover), according to the schematic
below.
PLC
Socket of extension
cable