Hand tool for AMP DUOPLUG 2.5™
©2009 Tyco Electronics Corporation, Harrisburg, PA
All International Rights Reserved
TE logo and Tyco Electronics are trademarks.
10/ 17
Operation Manual
4-744015-6
*Trademark. Other products, logos, and company names used are the property of their respective owners.
6
Making a connection
Fig. 2: Construction
1 Stop
3 Spring stuffers (both-sided)
2 Stuffer
4 Guide groove
6.1 Insertion of wires
Push the connector housing into the guide groove (4) until the stuffer (2) is positioned above the
first chamber (Fig. 3 item 5) which is to be terminated.
The housing will arrest in each position.
Fig. 3: Insertion of connector housing