10
GEL and Custom. For further charge program information, please see
chapters 3.3 and 5.1.
Configurable by
DIP switch (DIP 5 and 6) and Dashboard
Parameter
Charge current limit
Value
100%
Description
This parameter sets the maximum charge current in percent. 100%
equals 60A for the PSC1600-12-60 and 30A for the PSC1800-24-30. This
value can be set from 10% to 100% by Dashboard or the optional
Universal Remote Control. You can set this parameter to a lower value
when the connected battery is too small and cannot handle the
maximum charge current, or when you wish to (temporarily) reduce the
charger current share, in the total amount of current flowing through the
AC input of the Powersine Combi.
Configurable by
Dashboard and Universal Remote Control
3.3 DIP switch settings overview
During step 3 of the installation guide, you can alter the factory settings of the DIP switches
to change the functionality of the Powersine Combi on a few points. For additional
information about the settings, see the previous chapter (3.2). The following settings
can be made :
Setting description
Factory setting = OFF
Local / External Programming
ON (External) : DIP switches 2 to 7 are ignored and the
Powersine Combi will always load the
parameter settings as configured in TBS
Dashboard.
OFF (Local) : The local DIP switch settings are used. All
other parameters are set to the factory
default settings.
Factory setting = OFF
Inverter output frequency
ON : Output frequency is 60Hz
OFF : Output frequency is 50Hz
Factory setting = ON
Low battery protect
ON : Low battery protect is on
OFF : Low battery protect is off (immediate inverter
shutdown when the battery voltage is < 8.0V)