TBS Installation Manual
–
2D IRON & 3D AIR
TBS 2D IRON 3D AIR Mounting and Installation Guideline
•
TBS-056-057
•
Rev 09-2023
page 9 of 21
4.3
Mounting Instructions
4.3.1
Preparation
IMPORTANT:
Make sure that all power sources for the device are turned off before installation.
Before mounting the device, make sure of the following points to achieve an optimal installation:
•
The mounting strength of the terminal depends on the solidity and material of the wall. Make
sure to use an appropriate method to anker the mounting screws such as raw plugs.
•
Make sure to leave sufficient space in the wall behind the installation for the passage of cables.
•
Make sure that the installation wall is completely flat, to allow a nice and proper mounting. TBS
provides very accurately manufactured enclosures that only fit to the mounting box if no
obstacles are present between the wall and the terminal front.
4.3.2
Wall Mount Box
The following equipment and tools are required for mounting the wall mount variant.
•
Four ø4-5mm screws and fitting raw plugs suitable for the wall material (not included)
•
One screwdriver appropriate to drive the above screws
•
One drill with a drill bit of an appropriate diameter for the above raw plugs
•
One Allen wrench (size 3) screwdriver to open the terminal
The recommended mounting height of the terminal is 1.16 m, measured from the floor to the lower
screw holes of the back cover.