![Taylor RD25 Operator'S Manual Download Page 19](http://html1.mh-extra.com/html/taylor/rd25/rd25_operators-manual_3789364019.webp)
15
Models RD30/RC25
Operating Procedures
150706
Step 18
Position the torque arm by inserting it through the slot
in the torque switch arm and down into the hole in the
torque rotor which protrudes from the door. Verify
proper installation by moving the torque rotor back and
forth to be sure it moves freely and easily.
Figure 20
Step 19
Install the front drip tray and the splash shield under
the door spout.
Figure 21
Sanitizing
Step 1
Fill System.
Disconnect the product supply lines from
the mix delivery container. Prepare a pail of approved
100 PPM sanitizing solution (examples: 2- 1/2 gal. [9.5
liters] of Kay- 5
R
or 2 gal. [7.6 liters] of
Stera- Sheen
R
). USE WARM WATER AND FOLLOW
THE MANUFACTURER’S SPECIFICATIONS. Pour
the solution into a clean, empty mix delivery container.
Connect the container to the mix delivery line.
Figure 22
Step 2
Place the control switch in the “WASH” position. Press
the fill switch to activate the mix solenoid. The mix
solenoid will remain open until the mix level float switch
is satisfied. Drain sanitizer from the freezing cylinder
and repeat this procedure until full strength solution is
dispensed from the mix delivery container. Make sure
all sanitizer is removed from the fill system. Place the
fill switch in the “OFF” position and drain any remaining
solution from the freezing cylinder.
Figure 23
IMPORTANT!
The unit must NOT be placed in AUTO
until all sanitizing solution has been removed from the
freezing cylinder and proper priming procedures have
been completed. Failure to follow this instruction may
result in damage to the freezing cylinder.