OPERATION
These instructions are for operators experienced with cryogenic equipment. Before operating the
system, become familiar with the safety precautions in this manual and in reference publications.
Study this manual and the general arrangement drawing located in the back of this manual thor-
oughly. Know the location and function of all system components.
Receiving Inspection
Handling
Customer Installed Equipment/Piping
Filling by Pressure Transfer
Freight and damage claims are the customer’s responsibility .
Take time to visually inspect each ship-
ment in the presence of the carrier’s agent before accepting delivery. If any damage is observed, make
an appropriate notation on the freight bill. Ask the driver to sign the notation before receiving the
equipment. Do not accept equipment with damage that may affect serviceability.
The MB-450 should be handled only by a forklift or crane. Ensure that handling equipment has ade
-
quate rated capacity for the system weight listed on the general arrangement drawing in the appendix.
The MB-450 is a rugged product intended for years of industrial use. However, take care when mov
-
ing the unit. Abuse (dropping or careless handling by forklift) may affect the integrity of the insula
-
tion system or damage piping .
Always transport, operate, and store the unit in the vertical position.
Never place the unit on its side.
Important: When lifting by crane, use the lift-eyes provided on the top of the jacket. Never lift the unit over-
head.
When installing the MB-450 for remote filling, be sure to follow accepted design practices for cryogenic
equipment. All equipment must be cleaned for oxygen service. Be sure to include pressure relief valves in
all piping where liquid product could be trapped between closed valves, regulators, etc.
Designing safe and effective cryogenic systems requires extensive knowledge and experience. Persons
lacking the necessary skills are urged to seek competent advice before attempting to design cryogenic
systems.
Design and consultation services are available from the factory at the location shown at the front of the
manual.
Filling by pressure transfer is accomplished by lowering the pressure in the MB-450 below that of the
source vessel. Typically the source vessel is a cryogenic bulk tank or truck mounted vessel. The pres-
sure is reduced in the MB-450 by venting gas through the vent valve (V-2). Liquid is pushed by pressure
from the bulk tank and into the MB-450.
CAUTION:
Follow the safety precautions at the beginning of this manual. Accidental contact with liquid
or
cold gas can occur during filling.
A cryogenic transfer hose equipped with a relief valve and dump valve should be used to connect the
MB-450 to the liquid source. Follow the instructions below to fill by pressure transfer: