ELECTRICAL    CONNECTION 

 

 

 

The  electrical  contractor  must  follow  the  electrical  specification 

supplied with the ABS5000 system

 

 

 

Ensure all electrical works are only completed by licenced persons.

 

 

 

Ensure all electrical work is completed and compliant with AS/ANZ 3000.

 

 

Refer to Electrical Specifications on Page 12 & 13

 

 

9.

 

COMMISSIONING 

 

 

Please ensure the following is completed prior to having the system commissioned

 

 

 

Tanks is full of water (5,000lt each)

 

 

 

Effluent Disposal area is  installed

 

 

 

Effluent Disposal Area feed line is connected to ABS5000 (Tank 2)

 

 

 

Electrical power is connected (Tank 1 & 2)

 

 

 

Drains connected (main sewer into tank 1 and connection between Tank 1 & 2)

 

 

IMPORTANT: The Taylex

® 

ABS5000 System cannot be commissioned unless power is 

connected to the system.

 

The ABS5000 will then be switched on (commissioned) by an Employee of Taylex

® 

Industries, 

a Taylex

®

Accredited Distributor (TAD) or a Taylex

® 

Accredited Service Technician (TASA).

 

Summary of Contents for ABS5000

Page 1: ...Installation Manual ADVANCED BLOWER SYSTEM 5000 ABS5000 Standard...

Page 2: ...8 9 COMMISSIONING 8 10 EXCAVATION LIFTING INSTRUCTIONS 9 a ABS5000 Excavation Instructions 9 b ABS5000 Lifting Instructions 10 11 ELECTRICAL CONNECTION DIAGRAM 11 12 Note Do not act solely on the basi...

Page 3: ...ced if the ABS5000 is not immediately installed SLIPPERY WHEN WET During cleaning maintenance repair work the surrounding area may become extremely slippery due to spilt water Caution is to be taken w...

Page 4: ...moisture for heavy equipment access Weather conditions 5 MARK OUT To ensure the ABS5000 is installed in the position nominated by the Home Owner Builder the location of the ABS5000 should be marked o...

Page 5: ...n behind the vehicle before placing it into the prepared hole Maximum reach from the rear of the truck to the centre of ABS5000 will vary depending on the size of the crane To enable the ABS5000 to be...

Page 6: ...Page 6 of 13...

Page 7: ...n allows for the diversion of storm water and surface waters away from the system Width Height Inlet Height from bottom of tank Inlet Depth from ground level Required Base 5 7mm Drainage Gravel Sand H...

Page 8: ...inflow outflow direction 1 deviation Backfilling Use sand or excavated material spoil with maximum particle size of 300mm Backfilling of excavation to be completed in not more than 500mm equally dist...

Page 9: ...is completed prior to having the system commissioned Tanks is full of water 5 000lt each Effluent Disposal area is installed Effluent Disposal Area feed line is connected to ABS5000 Tank 2 Electrical...

Page 10: ...13 NON TRAFFICABLE LOADS ONLY NON TRAFFICABLE LOADS ONLY 6000 mm 2425 mm 2425 mm 100mm of 5mm 7mm drainage gravel or sand 100mm of 5mm 7mm drainage gravel or sand 100mm Inlet Lifting Holes Lifting Ho...

Page 11: ...ing Holes 1 Always use a Spreader Bar and ensure it is certified 2 Lower chains through TOP lifting holes provided in the lid of the ABS5000 3 Loop chains through the lifting holes directly below on t...

Page 12: ......

Page 13: ......

Reviews: