![background image](http://html1.mh-extra.com/html/tayana/37/37_operation-and-maintenance-manual_3744530028.webp)
III-7
SPARS AND RIGGING (After-Stepped)
YES
NO
CORRECTED
Standing rigging adjusted
Turnbuckles pinned and taped
Roller furling systems properly assembled
Spreader angle corrected
Mast rake correct
Winches run free
Sails fit and furl freely
Sheets installed and functional
Halyards function properly
Mast boot installed (if required)
Mast lights operational
STEERING INSPECTION
YES
NO
CORRECTED
Wheel rotates easily and uniformly
Steering cables properly tensioned
No unusual pump noise. (if hydraulic)
Connections at rudder post tight
FRESH WATER SYSTEM
YES
NO
CORRECTED
Cold water runs freely from all faucets
Hot water runs freely from all faucets
Hand pump operational
Shower operates properly
Electric pump shuts off, w/faucets closed
Plumbing system free of leaks
Summary of Contents for 37
Page 1: ...Chapter I OPERATIONS AND MAINTENANCE MANUAL Chapter 1...
Page 7: ...I 6...
Page 8: ...I 7...
Page 9: ...I 10...
Page 10: ...I 11 BARIENT WINCH 22 WINCH ASSEMBLY...
Page 14: ...II 3 Polars for Tayana37 Cutter...
Page 18: ...II 7...
Page 45: ...IV 8...
Page 54: ...IV 17...
Page 69: ...V 13...
Page 76: ...V 20...
Page 80: ...V 24 moisture eliminating product...
Page 81: ...V 25...