STEP 3
1. Attach the Right Floorstand ASSY (#4) and the Low Support Frame ASSY (#8) to the
Right Bottom Frame ASSY (#1) using:
two M12*80 SHCS (#57) four Φ13*Φ24*2.5 Flat Washer (#68)
two M12 Nylon Lock Nut (#69)
2. Attach the Left Floorstand ASSY (#3) and the Low Support Frame ASSY (#8) to the Left
Bottom Frame ASSY (#2) using:
two M12*80 SHCS (#57) four Φ13*Φ24*2.5 Flat Washer (#68)
two M12 Nylon Lock Nut (#69)
3. Attach the Low Support Frame ASSY (#8) to the Weight Stack Frame ASSY (#22) using:
two M10*80 SHCS (#54) four Φ11*Φ20*2 Flat Washer (#67)
two M10 Nylon Lock Nut (#70)
Note: NOT Wrench Tighten Bolts and Nylon Lock Nuts.
Assembly
21
Summary of Contents for WEIGHT ASSISTED CHIN/DIP COMBO IT95
Page 8: ...8 Exploded View and Parts List Overall...
Page 30: ......
Page 32: ...Assembly 32 STEP 9...
Page 33: ...Assembly 33 STEP 10...
Page 36: ......
Page 40: ......