34
VT9 PRO
5.3
Maintenance and Inspection Calendar
To avoid damage from body sweat, the equipment must be cleaned with a damp towel (no solvents!)
after each training session.
The following routine tasks must be performed at the specified intervals:
Part
Weekly
Monthly
Quarterly
Display console
C
I
Screws & cable connections
I
Plastic covers
C
I
Legend: C = clean; I = inspect
6
DISPOSAL
At the end of its operational life, this equipment cannot be disposed of in normal household waste.
Instead, it must be disposed of via an recycling centre. Further information can be obtained from
your local authority‘s recycling service.
The materials can be recycled as per their symbols. Through the reuse, recycling
of materials or other forms of recovery of old equipment, you make an important
contribution to the protection of the environment.
Summary of Contents for TF-VT9PRO-2
Page 2: ...2 VT9 PRO...
Page 4: ...4 VT9 PRO 9 WARRANTY 39 10 CONTACT 41...
Page 43: ...43...
Page 44: ...Vibration Plate VT9 Pro...