1
Main frame
2
2
Ground connection frame
2
3
Frame tube
1
51
Socket head inner hexagon bolt
M12*25
8
55
Snap ring
M12
8
58
Flat washer
Φ24*Φ13*2.5
8
14
Cross Over Pulley
Step 2:
Assembly of the Frame Tube
Mount the frame tube (3) to the main frames (1) with four bolts (51), four snap rings (55) and four flat
washers (58) on each of the main frames (1).
No. Name
Specification
Qty.
Summary of Contents for TF-PTT0212
Page 2: ...2 Cross Over Pulley...
Page 4: ...4 Cross Over Pulley...
Page 13: ...13...
Page 15: ...15...
Page 17: ...17...
Page 19: ...19...
Page 21: ...2 1 3 4 5 6 7 8 21...
Page 30: ...Exploded View 10 30 Cross Over Pulley 7 3 Exploded Drawing...
Page 35: ...35...