Cross Over Pulley
Step 5:
Assembly of the Pulleys and Cable Routing
࣑
ATTENTION
Always place the cables over or under
the pulleys first and only then mount
the pulleys. It can not be guaranteed
that the cables can be passed through
afterwards!
1. Insert the end of the cable (8) into the
opening of the sliding frame (4).
2. Mount the pulley 1 (13) to the ground
connection frame (2) with one bolt
(49), two flat washers (57), one pulley
cover (33) and one nut (61).
3. Mount the pulley 2 (13) to the main
frame (1) with one bolt (49), two flat
washers (57) and one nut (61).
4. Mount the pulley 3 (13) to the main
frame (1) with one bolt (49), two flat
washers (57) and one nut (61).
5. Mount the pulley 4 (14) to the top
weight plate bracket (6) with one bolt
(49), two flat washers (57) and one
nut (61).
6. Mount the pulleys 5&6 (14) to the
main frame (1) with one bolt (49),
two flat washers (57) and one nut (61)
each.
7. Mount the pulleys 7 (14) and 8 (13)
to the sliding frame (4) with one bolt
(49), two flat washers (57) and one
nut (61) each.
8. Repeat the steps 1-7 on the other
side.
Summary of Contents for TF-PTT0212
Page 2: ...2 Cross Over Pulley...
Page 4: ...4 Cross Over Pulley...
Page 13: ...13...
Page 15: ...15...
Page 17: ...17...
Page 19: ...19...
Page 21: ...2 1 3 4 5 6 7 8 21...
Page 30: ...Exploded View 10 30 Cross Over Pulley 7 3 Exploded Drawing...
Page 35: ...35...