13
Step 1:
Assembly of the Main Frame Parts
L
NOTICE
Do not tighten bolts and nuts completely yet. Leave room for adjustments.
1. Attach the main frame (2) and the support frame (4) to the front ground sticking pipe (1) with a
total of four M10*100 bolts (19), eight Ø11*Ø20*2 flat washers (26) and four M10 lock nuts (28).
2. Attach the rear ground sticking frame (3) to the main frame (2) and the support frame (4) with a
total of four M10*100 bolts (19), eight Ø11*Ø20*2 flat washers (26) and four M10 lock nuts (28).
3. Attach the cross connection frame (6) to the main frame (2) with two M10*70 bolts (21), four
Ø11*Ø20*2 flat washers (26) and two M10 lock nuts (28).
4. Attach the cross connection frame (6) to the suppoert frame (4) with two M10*100 bolts (19),
four Ø11*Ø20*2 flat washers (26) and two M10 lock nuts (28).
5. Tighten the bolts and nuts with the appropriate tools.
Summary of Contents for Pro Seated Leg Extension
Page 2: ...2 Seated Leg Extension...
Page 4: ...4 Seated Leg Extension...
Page 19: ...19 Foam Adjustable Support Pin Adjustable Support Weight Horn Weight Plate Weight Plate...
Page 29: ...7 Exploded View and Parts List Overall 29 7 3 Exploded Drawing...
Page 37: ...37 Notes...
Page 38: ...38 Seated Leg Extension Notes...
Page 39: ...39...