19
4.3
Maintenance and Inspection Calendar
To avoid damage from body sweat, the equipment must be cleaned with a damp towel (no solvents!)
after each training session.
The following routine tasks must be performed at the specified intervals:
Part
Weekly
Monthly
Quarterly
Screw connections
I
Cushions
C
Legend: C = clean; I = inspect
5
DISPOSAL
At the end of its operational life, this equipment cannot be disposed of in normal household waste.
Instead, it must be disposed of via an recycling centre. Further information can be obtained from
your local authority‘s recycling service.
The materials can be recycled as per their symbols. Through the reuse, recycling
of materials or other forms of recovery of old equipment, you make an important
contribution to the protection of the environment.
Summary of Contents for Pro Iso SESS7150
Page 2: ...2 Seated Chest Press...
Page 4: ...4 Seated Chest Press...
Page 25: ...Overall 25 7 3 Exploded Drawing...
Page 32: ...32 Seated Chest Press Notes...
Page 33: ...33 Notes...
Page 34: ...34 Seated Chest Press Notes...
Page 35: ...35...