background image

4

А.

   If  the  height  of  the  water  column  above  the  pump 

installation level exceeds 15 m, then the circuit breaker 

cannot  be  installed  directly  on  the  pump,  but  shall 

be installed higher so that the water column does not 

exceed 15 m.

B.

   It is recommended to connect the output pipe connector 

of the circuit breaker to the water supply network through 

a flexible hose with a cross section of at least 25 mm.

C.

   A safety valve will prevent water leakage in the event of 

a diaphragm breakout.

D.

   For correct operation of the circuit breaker, it is necessary 

that  the  maximum  pressure  at  the  input  to  the  circuit 

breaker be at least 2 bars.

E.

   When installing of a device, the direction of water flow 

must necessarily coincide with the indicators on a device.

F.

   The circuit breaker can be installed directly on the pump 

output pipe connector (taking into account p. A).

G.

   It  is  not  allowed  to  install  points  of  water  draw-off 

between the pump and the circuit breaker.

H.   Before starting, check the tightness of the pump suction 

line and fill it with water.

ELECTRICAL CONNECTION

STARTING

:

 When the circuit breaker is connected to a power 

source, the green «Power On» light-emitting diode lights up 

and  the  yellow  «Pump  On»  light-emitting  diode  indicates 

that the pump is started. The pump operates for some time, 

ensuring filling of a system and achievement of the pressure 

required. If this cycle is insufficient, the red «Failure» light-

emitting diode lights up. In this case, open the tap, press and 

hold the «Restart» button until the red light-emitting diode 

is  switched  off.  After  the  button  is  released  and  the  valve 

is closed, the circuit breaker will turn off the pump when it 

reaches maximum pressure.

OPERATION:

 After start-up, the circuit breaker operates in 

an automatic mode. If there is a malfunction, for example, 

due to lack of water in the system, formation of a plug in 

the suction line, etc., the device detects a problem within 

about  9  seconds  and  the  red  «Failure»  indicator  lights 

up,  and  the  pump  is  signaled  to  stop  to  prevent  damage 

caused by the lack of water. After fixing the problem, restart 

the  circuit  breaker  with  the  «Restart»  button.  The  circuit 

breaker with the restart function independently determines 

the presence of water and tries to restart the pump first in 

15 minutes, then in 30 minutes, and then on an hourly basis 

within 8 minutes.

A

B

C

E

F

D

G

H

MAXIMUM = 15 

m

L1

N

U

V

L1
N

PE

M

1-

1~ 50/60 Hz  220-240V

POWER

POMP

Summary of Contents for PC-10

Page 1: ...PC 10 PC 10A RU INSTRUKCJA MONTA U I EKSPLOATACJI INSTALLATION AND OPERATION MANUAL EN AUTOMATIC PUMP CONTROL tatraline com UA PL PRZEKA NIK AUTOMATYCZNY DO POMP...

Page 2: ......

Page 3: ...rying out of any installation works dismantling of the circuit breaker it is necessary to cut out a device from electric network as well as to open the valves for release of pressure in the system 4 D...

Page 4: ...to a power source the green Power On light emitting diode lights up and the yellow Pump On light emitting diode indicates that the pump is started The pump operates for some time ensuring filling of...

Page 5: ...damage resulting from improper installation or operation 1 Occurrence of malfunctions as a result of non compliance with the requirements of this guide on installation and operation including when th...

Page 6: ...k musi by pod czony za pomoc urz dze r nicowopr dowych przeka nika r nicowego z pr dem nie wi kszym ni 30 mA 3 Przed przyst pieniem do jakichkolwiek prac instalacyjnych prac zwi zanych z demonta em pr...

Page 7: ...lania wieci zielona dioda Power On a ta dioda Pump On wskazuje e pompa dzia a Pompa dzia a przez pewien czas zapewniaj c nape nienie systemu i osi gni cie wymaganego ci nienia Je li ten cykl jest niew...

Page 8: ...a u lub obs ugi 1 Usterki kt re powsta y w wyniku nieprzestrzegania wymaga niniejszej instrukcji monta u i obs ugi w tym w przypadku gdy parametry zasilania przekraczaj limity okre lone w niniejszej i...

Page 9: ...9 UA 10 1 90 1 35 70 1 1 1 1 1 220 240 50 1 1 IP65 10 1 1 10 1 5 1 2 30 3 4 35 6 9...

Page 10: ...10 15 15 B 25 C D 2 E F G H Power On Pump On Failure Restart 9 Failure Restart 15 30 8 A B C E F D G H MAXIMUM 15 m L1 N U V L1 N PE M 1 1 50 60 Hz 220 240V POWER POMP...

Page 11: ...11 tatraline com Reset 0 6 1 1 2 3 4 PC 10 PC 10A...

Page 12: ...12 10 1 90 1 35 70 1 1 1 1 1 220 240 50 1 1 IP65 10 1 1 10 1 5 RU 1 2 30 3 4 35 6 9...

Page 13: ...13 15 15 B 25 C D 2 E F G H Power On Pump On Failure Restart 9 Failure Restart 15 30 8 A B C E F D G H MAXIMUM 15 m L1 N U V L1 N PE M 1 1 50 60 Hz 220 240V POWER POMP...

Page 14: ...14 tatraline com Reset 0 6 1 1 2 3 4 PC 10 PC 10A...

Page 15: ......

Page 16: ......

Reviews: