©Copyright Task Force Tips, Inc. 2003 - 2010
LIH-020 September 25, 2010 Rev06
3
DUAL-FORCE KNOB INSTALLATION:
1) Place the label (HXD752) into the knob (HXD560).
2) Add o-ring (VO-005) to o-ring groove on top of the baffl e (HXD561) and groove.
3) Place the knob onto the Baffl e fully.
4) Install the Compression Spring (VM4195) and Torlon Ball (VB156TO).
5) Push down on Compression Spring and Torlon Ball and twist the Knob counter-
clockwise till it clicks in place.
6) Check for smooth operation between standard and low pressure settings.
PROBLEMS:
If you have any questions or problems, please call for assistance.
(800) 348-2686 • (219) 462-6161 • FAX (219) 464-0620
TASK FORCE TIPS INC. - www.tft.com
3701 Innovation Way • Valparaiso, IN 46383-9327
HXD752 Label
FIGURE 1
HXD560 Knob
FIGURE 2
STANDARD
36,
LO
W
35(6
685(
LO
W
35(6
685(
STAND
ARD
36,
EXPLODED VIEWS and PARTS LISTS
To ALL BASE and
SLIDE VALVE PARTS
(except 2-1/2 Blitz Base)
2-1/2"
ROCKER LUG
BRITISH
INSTANTAEOUS
STORZ
1-1/2" FULL-TIME
ROCKER LUG
2-1/2" LOCKOUT
ROCKER LUG
To 2-1/2
BLITZ BASE
ONLY
1c
5c
2c
3c
4c
5c
6c
7c
9c
5c
8c
15c
11c
5c
14c
13c
10c
1c
5c
12c
INDEX
DESCRIPTION QTY
PART
#
1c
2.5" HOSE GASKET
1
V3190
2c
2.5" ROCKER LUG COUPLING
1
P197
3c
O-RING-151
1
VO-151
4c
3/16 SS BALLS
48
V2120
5c
1/4-28X3/8 SOCKET SET
1
VT25-28SS250
6c
2.5" BIC COUPLING
1
H687
7c
52 MM STORZ COUPLING
1
H686
8c
O-RING-134
1
VO-134
9c
2.0" BSP MALE SWIVEL
1
H685
10c
1.5" COUPLING GASKET
1
V3130
11c
1.5" ROCKER LUG COUPLING
1
H694
12c
2.5" ROCKER LUG COUPLING
1
P198
13c
1.5" HARD GASKET GRABBER
SINGLE
1
H730-60D
DUAL FORCE
1
HD730-60D
14c
O-RING-141
1
VO-141
15c
3/16 SS BALLS
38
V2120