TARAL TAR 25 Owner'S Manual Download Page 8

7.4- EMÝÞ VE BASINÇ SUPAPLARININ KONTROLÜ
Bu iþlem esnasýnda pompa çalýþtýrýlmamalýdýr. Yýlda en az bir kere supaplar kontrol edilmelidir. 
Bunun için TAR 25, TAR 30,TAR 50, TAR 55 AB ve TAR 90AB Pompada hava kabý altýný,TAR 60,TAR 80,TAR 
80AB,TAR 100,TAR 125 ve TAR 150 Pompada ise manifoltlarý yerinden çýkartýn, supaplarýn yýpranmýþ veya baþka 
maddelerle kaplanmýþ olup olmadýðýna bakýn. Supaplarý takarken yerlerine doðru oturup oturmadýðýný kontrol edin.

7.4- CHECK UP OF THE SUCTION AND PRESSURE VALVES
The pump must not be run during this operation. The valves should be checked minimum once a year.To do this, 
remove the air chamber lower body for the pumps TAR 25, TAR 30,TAR 50, TAR 55 AB and TAR 90AB, the manifolds 
for the pumps TAR 60,TAR 80,TAR 80AB,TAR 100,TAR 125 and TAR 150, check whether the valves are worn or 
corroded with other particles. Make sure that the valves are mounted to their seats correctly. 

7.5- MEMBRANLARIN KONTROLÜ
Bu iþlem esnasýnda pompa çalýþtýrýlmamalýdýr. Membranlar senenin belirli zamanlarýnda bilhassa sonunda kontrol 
edilmelidir. Pompayý sökün,membranlarýn üzerinde çizik olup olmadýðýna veya gözle görülebilir zarar görüp 
görmediðine bakýn gerekirse deðiþtirin.

7.5- CHECK UP OF THE DIAPHRAGMS
The pump must not be run during this operation. The diaphragms should be checked at certain periods of the year, 
especially at the end of the year. Remove the pump, see whether there is any scratch on the diaphragms or they are 
damaged apparently, and change them if needed.

7.6- HAVA KABI LASTÝÐÝNÝN KONTROLÜ

 

Bu iþlem pompa çalýþmazken yapýlýr ve hava kabý içindeki hava tahliye edilmeden açýlmaz. Hava kabýnda yaklaþýk 
TAR 30,TAR 50,TAR 60 ve TAR 80 pompada 4 kg/cm

²

, TAR 25, TAR 55 AB, TAR 90 AB pompada 2kg/cm², TAR 

100,TAR 125 ve TAR 150 pompada 5 kg/cm

²

  basýnç vardýr. 

Önce supapý kullanarak bu havayý tamamen tahliye edin. Sonra civatalarý sökerek hava kabý lastiðini kontrol edin, 
gerekiyorsa deðiþtirin. Tekrar iþlemi tersten yaparak hava kabýný toplayýn, içine gerekli basýnçlý havayý basýn, basýncý 
kontrol edin.  

7.6- CHECK UP OF THE AIR CHAMBER RUBBER
This operation is made while the pump is not running and the air chamber is not opened without releasing the air 
trapped inside. In the air chamber the air pressure is approx. 4 kg/cm² in the pumps TAR 30,TAR 50,TAR 60 and TAR 
80, 2 kg/cm² in the pumps TAR 25, TAR 55 AB, TAR 90 AB, 5 kg/cm² in the pumps TAR 100,TAR 125 and TAR 150. 
Firstly release all the air using the valve. Then check the air chamber rubber after removing the screws, change it if 
needed. Assemble the air chamber by performing the reverse operation, press the necessary air inside and check the 
pressure level.

 

7.7- DÝÐER BAKIMLAR
Pompa hortumlarýnýn baðlantý ve basýnç kontrolü
1- Emiþ hortumlarýnýn herhangi bir noktada katlanmamýþ olduðundan ve sývýnýn tamamen rahatlýkla aktýðýndan emin 
olun. Emiþ dirseði oringinin yerine tam oturduðundan emin olun.
2- Emiþ filitresinin temiz olduðundan emin olun. Hava kabýndaki hava basýncýný kontrol edin.
3- Tüm musluklarý kontrol edin. Hiçbir zarar görmediðinden emin olun.
4- Pompa yað seviyesini kontrol edin.Gerekli limitler arasýnda  kaldýðýndan emin olun.

7.7- OTHER MAINTENANCE
Check up of the connection and pressure of the pump hoses
1-Make sure that the suction hoses are not folded at any point and the liquid flows freely. Make sure that the O-ring of
 the suction elbow fits into its seat properly.
2-Make sure that the suction filter is clean. Check the air pressure in the air chamber.
3-Check all the valves. Make sure that they are not damaged.
4-Check the pump oil level.  Make sure that it is kept within the necessary limits.

(8)

Summary of Contents for TAR 25

Page 1: ...R 80AB TAR 100 TAR 125 TAR 150 H DROL K MEMBRANLI POMPALAR TSE EN ISO 9001 2000 KBK 520 5305003 4 Yay n Tarihi Publication Date 04 05 2004 Revizyon Tarihi Revision Date 01 04 2007 TAR 25 30 50 60 80 T...

Page 2: ...arda kullan lm t r This symbol is used for subjects required to note seriously Makine tan tma ve kullanma k lavuzu Machine introduction and operating manual Emniyet mesafesini koruyunuz Please keep th...

Page 3: ...M ET KET 11 11 3 CE BEYANI 12 12 F RMA ADRES VB 12 INDEX 1 CONDITIONS OF USAGE 4 2 SAFETY INSTRUCTIONS 4 3 WARRANTYTERMS 5 4 FIRST OPERATION 6 5 OPERATION OF THE MACHINE 6 6 EQUIPMENT AND INSTALLATION...

Page 4: ...LARI 1 Pompalar n kontrol ve kullan m n tamam yla anlayana kadar bu k lavuzu okuyun 2 18 ya ndan k kler ve pompay yeterince tan mayanlar n kullanmas sak ncal d r 3 Devaml olarak hortum ve ba lant lar...

Page 5: ...a ba l olarak dolayl ve do rudan verilen zarar ve hasar bedeli denmeyecektir 3 Makina zerinde damgalanm seri numaras de i tirilmi ise herhangi bir de i iklik yap lm ise makina bir kazaya u ram ise sat...

Page 6: ...t pawl and or the lever Let all the air left in the pump line and hoses be released by running the pump at zero pressure for a couple of minutes You can discharge the regulator by lifting the lever of...

Page 7: ...be connected with other fittings safely 7 BAKIM MAINTENANCE 7 1 POMPA KULLANILDIKTAN SONRA Her al ma sonunda bu al malar k sa s reli dahi olsa kullan lan s v ile temasta olan pompa par alar temiz su...

Page 8: ...90 AB pompada 2kg cm TAR 100 TAR 125 ve TAR 150 pompada 5 kg cm bas n vard r nce supap kullanarak bu havay tamamen tahliye edin Sonra civatalar s kerek hava kab lasti ini kontrol edin gerekiyorsa de...

Page 9: ...540 Anma bas nc Pressure kg cm 40 40 20 20 Anma debisi Output lt dak 58 85 75 80 Gerekli g Power Kw 4 0 8 3 2 3 5 Verim Output 83 80 67 65 Kullan lan ya cinsi Oil Type 20W 50 Motor ya Dizel 20W 50 Eng...

Page 10: ...viyesine kadar 20W 50 motor ya Dizel doldur Drain the oil ofthe pump Detach the eap sand replace the diaphragms Fill 20W 50 engine oil Diesel until its required level Mayi ak d zensiz Unstable liquid...

Page 11: ...Pompan n Debisi Flowrate 7 Pompan n Bas nc Pressure 8 Seri Numaras Serial Number 9 malat Y l Production Year 10 Ruhsat Tarihi ve nosu Date and no of the license 11 CE Y netmenli ine G re Uygunluk Mark...

Page 12: ...2 612 12 39 0212 674 06 79 RT BAT B ROLARI LIAISON OFFICES ANKARA TEL PHONE 0312 427 71 82 FAX 0312 467 73 82 ZM R TEL PHONE 0232 479 33 36 FAX 0232 479 17 40 GSM 0536 314 87 61 B LGE TEMS LC L KLER M...

Reviews: