background image

MAIN BURNER 
(#48) ORIFICE  (5021.3407)

MINIMUM RATE SCREW (5005.011)

CONVERSION LABEL (5052.52085)

 For use with model:
 Pour utilise avec du modèle:

LP GAS/ 

DU GAZ LP 

12.5 in/wc /12.5 po/c.e. 
     (3.11 kPa) 

      

13.9 in/wc / 13.9 po/c.e. 
     (3.45 kPa) 

      

11.0 in/wc / 11.0 po/c.e. 
     (.95 kPa) 

      

# 48     (1.93 mm) 

Max.:   35,000   (10.3)
Min.:    27,000  (7.91)

 

080411 6-TC30 5052.52085

Date:

 ______________________

By / Par:

 ___________________  

This appliance was converted 
to PROPANE GAS with this kit 
on this date by the organiza-
tion which accepts the respon-
sibility that this conversion 
has been properly made. / Cet 
appariel etair converter au gaz 
LP par l’emploi de la trousse 
de conversion par une organi-
zation qui accepte la responsi-
bilité pour une installation en 
bon état.

 

TC30

Series C

If the unit is to be used on propane 
convert as follows using the 
components supplied with this 
burner:

CAUTION

The gas supply and electrical power 
shall be shut off before proceeding 
with the conversion.

Note: Factory supplied components must be 
used to ensure correct input.  
After conversion confi rm proper manifold 
pressure.

1. 

Ensure the burner, pilot and gas 

 

supply are turned off, and the 

 

appliance has cooled.

2. 

Remove the two screws securing the  

 

the burner grate. 

 (Fig. 

#14)

3.  

Remove the two screws securing the 
manifold assembly to the burner. 

 (Fig. 

#15)

4.  

Remove the manifold assembly from the 
burner. (Fig. #16)

WARNING

This conversion kit 
shall be installed by a 
qualifi ed service agency 
in accordance with the 
manufacturer's instructions 
and all applicable codes 
and requirements of 
the authority having 
jurisdiction. 

If the information in these 
instructions is not followed 
exactly, a fi re, explosion 
or production of carbon 
monoxide may result 
causing property damage, 
personal injury or loss of 
life. 

The qualifi ed service 
agency is responsible for 
the proper installation of 
this kit. 

The installation is not 
proper and complete 
until the operation of the 
converted appliance is 
checked as specifi ed in the 
manufacturer's instructions 
supplied with the kit.

Fig #14

Fig #15

Fig #16

9

TC30.NG06C 200411-16

Propane Conversion

Summary of Contents for TC30

Page 1: ...ALLER Leave this manual with the appliance CONSUMER Retain this manual for future reference These instructions are supplementary to the Installation and OperatingInstructionssuppliedwiththefireplacean...

Page 2: ...lots in the burner overthetwoscrewslocatedinthefirebox base Fig 1 1a 2 Slide the burner back to engage the screws in the small part of the keyhole slot and tighten screws Fig 1b 3 Remove access cover...

Page 3: ...firebox 2 screws Attach the ignition and sensor wires to the module Red end to the connector marked by the reddot whiteendtotheconnectormarked by the white dot Fig 2 Fig 3 Fig 2 Burner Grate Installat...

Page 4: ...d tighten Fig 4 Ensure the connections are gas tight Conceal the spark and sensor wires below the supply tubes A panel set must now be installed See InstallationandOperatingInstructions manual for det...

Page 5: ...cover up gas lines and brackets Note Ember material placement and amount will affect flame appear ance More ember material results in lower flame height Add or remove as needed until desired flame af...

Page 6: ...Fig 9 Fig 8 LOG 2 LOG 3 6 TC30 NG06C 200411 16...

Page 7: ...Fig 11 Fig 10 LOG 4 LOG 5 7 TC30 NG06C 200411 16...

Page 8: ...Fig 13 LOG 7 Note Improper placement of logs will cause sooting on internal parts and glass Fig 12 LOG 6 8 TC30 NG06C 200411 16...

Page 9: ...nversion Note Factory supplied components must be used to ensure correct input After conversion confirm proper manifold pressure 1 Ensure the burner pilot and gas supply are turned off and the applian...

Page 10: ...lf turn Fig 20 9 Slide the pilot adjustment band over and ensure that the hole in the orifice band is showing Fig 21 shows NG position Fig 22 shows LP position Retighten pilot head 10 Remove right han...

Page 11: ...ould stay down Fig 26 Replace the aluminum cap 15 Fill in the date and the name of the personwhoperformedtheconversionin the white area on the conversion label Peelofftheprotectivebackingandapply the...

Page 12: ...sure a gas tight connection Correct gas pressure requirement Supply Pressure Natural Gas Propane Min Pressure 5 0 WC 12 5 WC For purpose of input adjustment Max Pressure 13 9 WC 13 9 WC Manifold Press...

Page 13: ...tate the shutter to increase or decrease the amount of primary air 6 Reassemble in reverse order The air shutter on the burner tube controls the primary combustion air to the gas burner and is preset...

Page 14: ...2 TUBE CONNECTION 1h PILOT BRACKET 1i HEAT SHIELD 1j HEAT SHIELD INSULATION 2a BASE LOG 2b TOP LEFT LOG 2c TOP RIGHT LOG 2d CENTER CHUNK 2e BOTTOM LHS CHUNK KIT CONTENTS 2f BOTTOM CENTER CHUNK 2g BOTT...

Page 15: ...15 TC30 NG06C 200411 16...

Page 16: ...Printed in Canada Technical support 1 250 748 1184 Web site www townandcountryfireplaces net 2975 Allenby Rd Duncan BC V9L 6V8...

Reviews: