viii
Contents
Figures
Figure 1. Front Panel of the StorageLibrary ............................................................................................................................... 15
Figure 2. Rear Panel of the StorageLibrary with 1 full-height SCSI Drive Installed ..................................................................... 16
Figure 3. Two T40+ units mounted in a rack .............................................................................................................................. 21
Figure 4. Position of the Rack Installation Stencil (Front View)................................................................................................... 25
Figure 5. Matching the Hole-set ................................................................................................................................................. 25
Figure 6. Position of the Rack Installation Stencil (Rear View) ................................................................................................... 26
Figure 7. Aligning of the Rack Installation Stencils for systems with more than two units ........................................................... 26
Figure 8. The Rail Assemblies ................................................................................................................................................... 27
Figure 9. Screw Mounting Sequence (Front View) ..................................................................................................................... 27
Figure 10. Rear View of the Rack .............................................................................................................................................. 28
Figure 11. Rack-Ear Mounting Holes ......................................................................................................................................... 28
Figure 12. Remove the top blanking plate of the lower-most unit ............................................................................................... 29
Figure 13. Remove the bottom blanking plate of the upper-most unit......................................................................................... 29
Figure 14. Slide the units onto the rails, leaving ~100mm for ear mounting................................................................................ 30
Figure 15. Remove the transport locking screws........................................................................................................................ 30
Figure 16. Mount the ears on the side of the units ..................................................................................................................... 31
Figure 17. Ear screws mounting sequence ................................................................................................................................ 31
Figure 18. Install the Pass-Thru box in the Pass-Thru magazine ............................................................................................... 32
Figure 19. Exchange the right lower-most magazine with the Pass-Thru magazine in all the units except the upper most unit .. 32
Figure 20. The Complete System .............................................................................................................................................. 33
Figure 21. Transport Locking Screws Marked with Red Plastic Tabs ......................................................................................... 33
Figure 22. Mounting the Rack Mount Ears ................................................................................................................................. 34
Figure 23. StorageLibrary Cabling (SCSI interface) ................................................................................................................... 35
Figure 24. StorageLibrary Cabling (SAS interface)..................................................................................................................... 36
Figure 25. StorageLibrary Cabling (Fibre Channel interface)...................................................................................................... 37
Figure 26. Positioning of Barcode Label for LTO Cartridges ...................................................................................................... 39
Figure 27. Available Tandberg Data Cartridge Labels. ............................................................................................................... 39
Figure 28. Front Panel Interface (FPI) Top Level Menu Tree ..................................................................................................... 43
Figure 29. Remote Management Interface (RMI) Top Level Menu Tree..................................................................................... 44
Figure 30. Remote Management Interface Home Screen .......................................................................................................... 45
Figure 31. Maps Menu on the FPI.............................................................................................................................................. 47
Figure 32. Removing a Magazine from the Library..................................................................................................................... 68
Figure 33. Inserting a Cartridge into the Magazine Slot.............................................................................................................. 68
Figure 34. Ejecting a Cartridge from the Magazine Slot. ............................................................................................................ 69
Figure 35. Inserting a Magazine into the Unit ............................................................................................................................. 69
Figure 36. Ejecting a Magazine using the Emergency Release Tool .......................................................................................... 70
Figure 37. The Back of the Library ............................................................................................................................................. 75
Figure 38. Replacing a Power Supply ........................................................................................................................................ 76
Figure 39. Adding a second Power Supply ................................................................................................................................ 77
Figure 40. Hot-Swapping a Power Supply.................................................................................................................................. 78
Figure 41. Adding or Removing a Tape Drive ............................................................................................................................ 80
Figure 42. Cartridge Write-Protect Switch and Correct Label Location....................................................................................... 86
Figure 43. Transport Locking Screws Marked with Red Plastic Tab ......................................................................................... 102
Figure 44. The StorageLibrary partly packed ........................................................................................................................... 102