background image

                                                                                                                             

Installation Manual

Ground Roof

Mount Series

[email protected]            1-800-819-7236 Ext 556

     Page 7

Step 4

Attaching PV modules to panel supports

A. Lay the PV Modules face-down on a protected flat surface mounting hole side up.

B. Lay the flat side of the panel support channels across the panels keeping panels and supports 

parallel.

C. Align mounting holes on the panels with the slots on the panel supports, allow 

       Approximately 1/4" to 1” in between PV modules and leave any available left-over support length at  

       the bottom of the array for ground clearance to allow for vegetation management.
D. Secure with 5/16” hardware and torque to 132 in-lbs. if the mounting holes on the solar panels are 

large enough. If the panels have 1/4” or 6 mm holes, use the ¼” hardware in the  29-5000-0GR 
mounting hardware kits and torque them to 75 in-lbs.

Summary of Contents for Ground Roof Mount Series

Page 1: ...d Roof Mount Series Installation Manual Panel Support length 90 UNI GR Manual v3 Formodels UNI GR 90 UNI GR 130 130 The picture at rtight shows the rear view of 2 of the UNI GR mounts connected with t...

Page 2: ...ion 10 InstallerResponsibility 11 Warranty Information 11 Introduction The Universal Ground Roof Mount is a simple and universal mounting solution up to 3 solar panels With its user adjustable angle s...

Page 3: ...nnector 2 2 51 0545 001 Panel Support Channel 45 inch 4 51 0565 001 Panel Support Channel 65 inch 4 51 0546 000 Inner Brace Channel 46 inch 2 2 51 0546 001 Outer Brace Channel 46 inch 2 2 51 6000 003...

Page 4: ...t Panel Support Channels A Slide the 10 connector halfway into the end of the one of the panel support and install the 5 16 hardware Torque to 132 in lbs repeat with the second panel support to achiev...

Page 5: ...rface measure the center to center distance between the U feet to determine the front to rear spacing for the footing B Keep the rear brace assembled at the overlap determined in prior operation preas...

Page 6: ...nd D is the distance from the top of the module mounting rail to the hole used to connect the back leg See the diagrams on Page 4 UNI GR 90 UNI GR 130 A ANGLE 36 A ANGLE 32 C OVERLAP 16 28 40 44 C OVE...

Page 7: ...Installation Manual Ground Roof Mount Series support tamaracksolar com 1 800 819 7236 Ext 556 Page 6 Step 3 Foot attaching options Use Galvanized or Stainless Steel Hardware See Suggestions below...

Page 8: ...d supports parallel C Align mounting holes on the panels with the slots on the panel supports allow Approximately 1 4 to 1 in between PV modules and leave any available left over support length at the...

Page 9: ...otings align the feet east west and north south and torque 3 8 16 galvanized hardware to 16 ft Lbs Concrete footings shown Space between mounts Step 2 Attach Preassembled rear braces to footings A Loo...

Page 10: ...to footings A Loosely attach one end of the Panel assembly to the U feet on the footings Step 4 Attach rear braces to panel supports A Tilt up the array and the rear braces and bolt the rear leg into...

Page 11: ...nt This brace is adjustable from 18 25 to 32 and can be used with solar panels that have mounting holes that at between 7 and 15 from the end of the modules A Loosely connect the inner and outer inter...

Page 12: ...s VOID if the practices specified by AAMA 609 610 02 Cleaning and Maintenance for Architecturally Finished Aluminum www aamanet org are not followed by Purchaser for Tamarack Solar s aluminum based pr...

Reviews: