![background image](http://html1.mh-extra.com/html/takeuchi/tl230/tl230_operators-manual_3336555097.webp)
3-9
OPERATION
Warm-up in cold climates
1. Perform the normal warm-up procedure.
2. Set the bucket cylinder at the stroke end
and keep it there.
Do not keep this condition for more than
30 seconds.
3. Repeat Step 2 until the bucket operating
speed becomes normal.
INSPECTION AFTER WARM-UP
After warming up the engine and machine
(hydraulic oil), perform the checks and
inspections described below, and repair if
necessary.
OPERATING THE MACHINE
1. Check that the warning lamps and meters
are as follows:
· Are all warning lamps off?
· Is the indicator on water temperature
gauge seen within the green range?
2. Check that there are no irregularities in the
exhaust color, sound and vibrations.
3. Raise the safety bar to the locked position,
and then check that the control levers are
locked.
Summary of Contents for TL230
Page 1: ......
Page 10: ...0 8...
Page 11: ...1 1 SAFETY...
Page 47: ...1 37 SAFETY SAFETY SIGNS DECALS...
Page 48: ...1 38 SAFETY SAFETY SIGNS DECALS...
Page 49: ...1 39 SAFETY SAFETY SIGNS DECALS...
Page 50: ...1 40 SAFETY SAFETY SIGNS DECALS...
Page 51: ...2 1 CONTROLS...
Page 89: ...3 1 OPERATION...
Page 95: ...3 7 MEMO...
Page 116: ...3 28...
Page 117: ...4 1 TRANSPORT...
Page 121: ...5 1 MAINTENANCE...
Page 174: ...5 54...
Page 175: ...6 1 TROUBLESHOOTING...
Page 190: ...6 16...
Page 191: ...7 1 SPECIFICATIONS...
Page 193: ...7 3 MEMO...
Page 194: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS MACHINE DIMENSIONS...
Page 196: ...7 6 SPECIFICATIONS OPERATING RANGES OPERATING RANGES...
Page 198: ...7 8...
Page 199: ...8 1 OPTIONS...