![background image](http://html1.mh-extra.com/html/takeuchi/tl230/tl230_operators-manual_3336555109.webp)
3-21
OPERATION
Raise the lift arms and tilt the bucket forward, then release it as the machine is driven forward.
Next tilt the bucket forward and lower the front edge until it is slightly above the ground
surface, then back the machine over the load that was just released.
Backfilling
With the bucket lowered, drive near the hole and tilt the front edge of the bucket downward as
soon as it passes over the near side of the hole. Raise the bucket and empty the load only
when necessary.
Leveling
OPERATING PROCEDURES
Summary of Contents for TL230
Page 1: ......
Page 10: ...0 8...
Page 11: ...1 1 SAFETY...
Page 47: ...1 37 SAFETY SAFETY SIGNS DECALS...
Page 48: ...1 38 SAFETY SAFETY SIGNS DECALS...
Page 49: ...1 39 SAFETY SAFETY SIGNS DECALS...
Page 50: ...1 40 SAFETY SAFETY SIGNS DECALS...
Page 51: ...2 1 CONTROLS...
Page 89: ...3 1 OPERATION...
Page 95: ...3 7 MEMO...
Page 116: ...3 28...
Page 117: ...4 1 TRANSPORT...
Page 121: ...5 1 MAINTENANCE...
Page 174: ...5 54...
Page 175: ...6 1 TROUBLESHOOTING...
Page 190: ...6 16...
Page 191: ...7 1 SPECIFICATIONS...
Page 193: ...7 3 MEMO...
Page 194: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS MACHINE DIMENSIONS...
Page 196: ...7 6 SPECIFICATIONS OPERATING RANGES OPERATING RANGES...
Page 198: ...7 8...
Page 199: ...8 1 OPTIONS...