159
MAINTENANCE
When Required
10. Ground the crawlers and lower the
machine body so that the crawler slack
is maximum.
11. When the crawlers come away from the
idlers, slide the crawlers to the outside
and remove them.
12. Disengage the crawlers and sprockets,
then remove the crawlers from the
crawler frames.
Installation
1. Engage the crawlers with the left and right
sprockets.
2. Set the left and right crawlers on the idlers.
3. Start the engine.
4. Press the travel speed switch once and
set it to the 2nd speed side. The left and
right crawlers are tightened
simultaneously.
5. Check that the crawlers are properly
tightened. Standard value (A).
Refer to page 128 “Inspecting and
adjusting the Crawler Tension”.
Summary of Contents for TB153FR
Page 6: ...4...
Page 8: ...6...
Page 45: ...43 MEMO...
Page 68: ...66...
Page 89: ...87 MEMO...
Page 108: ...106...
Page 180: ...178 SPECIFICATIONS Machine Dimensions...
Page 182: ...180 SPECIFICATIONS Operating Range J1K0021 D J H K C F G A E B...
Page 184: ...182 MEMO...
Page 194: ...192...
Page 225: ...223 MEMO...
Page 230: ...228...
Page 231: ...229 INDEX...