![background image](http://html1.mh-extra.com/html/takeuchi/tb153-fr/tb153-fr_operators-manual_814653097.webp)
95
OPERATION
Operating Procedures
3. Once the mound is low, remove the dirt
from the top. If the load on the body is too
heavy, adjust by raising or lowering the
dozer blade.
Digging Side Ditches
Use the boom swing function to dig side
ditches as shown in the diagram.
Loading
When loading dirt in a truck, starting from
the back of the truck’s bed makes for easier
loading and increases the amount of dirt that
can be loaded.
Also, use a small slewing angle for greater
efficiency.
Leveling
1. Bring the hoe attachment close to the
body.
2. Gradually remove the dirt from the side of
the mound.
E4D052
60
°
75
°
E4D053
Summary of Contents for TB153 FR
Page 6: ...4...
Page 8: ...6...
Page 45: ...43 MEMO...
Page 68: ...66...
Page 89: ...87 MEMO...
Page 108: ...106...
Page 180: ...178 SPECIFICATIONS Machine Dimensions...
Page 182: ...180 SPECIFICATIONS Operating Range J1K0021 D J H K C F G A E B...
Page 184: ...182 MEMO...
Page 194: ...192...
Page 225: ...223 MEMO...
Page 230: ...228...
Page 231: ...229 INDEX...