OPERATION
Operating Procedures
Operations Possible with this
Machine
Excavating
1. Set the dozer blade on the side opposite
the side you want to dig on.
2. Use the arm and bucket and dig with
shallow, long strokes. The digging force
is strongest when the boom and arm angle
is 80 to 120
°
. Use this angle for effective
digging.
Digging Ditches
Mount a bucket suited for digging ditches and
set the crawlers parallel to the ditch to be
dug for greater efficiency.
When digging wide ditches, dig the sides first,
the center later.
Digging Side Ditches
Use the offset function to dig side ditches as
shown in the diagram.
Loading
When loading dirt in a truck, starting from
the back of the truck’s bed makes for easier
loading and increases the amount of dirt that
can be loaded.
Also, use a small slewing angle for greater
efficiency.
E4D051
B5D022
E4D0501
80 ~120
Summary of Contents for TB108
Page 6: ...4...
Page 8: ...6...
Page 52: ...50...
Page 82: ...80...
Page 83: ...81 TRANSPORT Loading and Unloading 82 Securing the Machine 83 Cautions on Transporting 84...
Page 138: ...136 MEMO...
Page 140: ...138 SPECIFICATIONS Machine Dimensions P X D Y Z T L U B X N M B5K001 F S E V C G Q J W H K R A...
Page 142: ...140 SPECIFICATIONS Operating Range B5K002 E F G D C H B J K A...
Page 144: ...142 MEMO...
Page 150: ...148...
Page 163: ...161 INDEX...