Front, rear, Ieft and right
This manual refers the front, rear, left and
right of the machine as seen when sitting in
the operator’s seat with the dozer blade
visible to the front.
■
Designated operations
Use this machine primarily for the following
operations:
¡
Excavating
¡
Digging ditches
¡
Digging side ditches
¡
Leveling
¡
Loading
MACHINE DESCRIPTlON
■
Features
¡
Short pitch rubber crawler
¡
Low engine noise and exhaust emissions
¡
Fast working speed and low-shock working equipment
¡
Excellent stability thanks to a low center of gravity
■
Break-in period
When is new, heed the instructions below when operating the machine for the first 100 hours
(as indicated on the hour meter).
Using a new machine roughly without breaking it in will lead to quicker deterioration of machine
performance and may shorten the machine’s service life.
¡
Warm up the engine and hydraulic oil sufficiently.
¡
Avoid heavy loads and rapid operations. Operate with a load of about 80% the maximum
load.
¡
Do not start up, accelerate, change directions, or stop abruptly unless necessary.
Summary of Contents for TB108
Page 6: ...4...
Page 8: ...6...
Page 52: ...50...
Page 82: ...80...
Page 83: ...81 TRANSPORT Loading and Unloading 82 Securing the Machine 83 Cautions on Transporting 84...
Page 138: ...136 MEMO...
Page 140: ...138 SPECIFICATIONS Machine Dimensions P X D Y Z T L U B X N M B5K001 F S E V C G Q J W H K R A...
Page 142: ...140 SPECIFICATIONS Operating Range B5K002 E F G D C H B J K A...
Page 144: ...142 MEMO...
Page 150: ...148...
Page 163: ...161 INDEX...