152
OPTIONS
Canopy (When equipped with Lift eyes)
Lifting the Machine
WARNING
¡
¡
¡
¡
¡
Know and use correct crane signals.
¡
¡
¡
¡
¡
Inspect the lifting equipment daily for
damaged or missing parts.
¡
¡
¡
¡
¡
Keep all other persons out of the area
when lifting. Do not move the machine
over the heads of ther persons.
¡
¡
¡
¡
¡
Do not lift the machine with an
operator(s) on it.
¡
¡
¡
¡
¡
When lifting, use a wire rope with
sufficient strength with respect to the
machine’s weight.
¡
¡
¡
¡
¡
Do not lift with the machine in a posture
other than the one described in the
procedure below. Doing so is
dangerous as it may result in the
machine losing its balance.
IMPORTANT: This lifting method applies
to machines with standard specifications.
When lifting this machine with a crane, use
a two leg sling with a 60 degree sling angle.
Each leg of the sling must have a minimum
length of 450mm(17.7 in.).
Lifting posture
1. Park the machine on a level surface.
2. Set the slew lock lever to the locked
position.
3. Fully extend the bucket, arm and boom
cylinders.
4. Raise the dozer blade.
5. Set the safety lock lever securely to the
locked position.
6. Stop the engine and remove the starter
key.
7. Fix the sling to the lift eyes.
Lifting
1. Lift slowly until the machine just leaves
the ground.
2. Stop lifting until the machine is stable.
3. Lift slowly.
450mm(17.7in.)
B5L003
B5L004E
Lift Eye
Summary of Contents for TB108
Page 6: ...4...
Page 8: ...6...
Page 52: ...50...
Page 82: ...80...
Page 83: ...81 TRANSPORT Loading and Unloading 82 Securing the Machine 83 Cautions on Transporting 84...
Page 138: ...136 MEMO...
Page 140: ...138 SPECIFICATIONS Machine Dimensions P X D Y Z T L U B X N M B5K001 F S E V C G Q J W H K R A...
Page 142: ...140 SPECIFICATIONS Operating Range B5K002 E F G D C H B J K A...
Page 144: ...142 MEMO...
Page 150: ...148...
Page 163: ...161 INDEX...