![background image](http://html1.mh-extra.com/html/takara/dry-wave-tm1412/dry-wave-tm1412_installation-manual_3314021002.webp)
●
When using electric tools, make sure to make the proper torque adjustments.
Refrain from using an Impact Drill.
●
When installing near a glass window, make sure that there is sufficient space so
that the pole will not come in contact with the window.
Furthermore, store away the pole during times of high winds.
●
Risk of STEEL DRYING RACK falling or damaging of screws.
●
Can cause damage to property.
●
Can cause damage to property.
●
Make sure that the location where the base will be mounted is firm and strong.
●
Can cause damage to property.
●
Do not install in places where the ceiling has a slope of more than 30°.
●
Risk of STEEL DRYING RACK falling or damaging of screws.
●
Locate the ceiling joist and use a screw that is most suiting.
2
※
Decision on the location of mounting should be made after discussing it with owner of the product.
①
Decide on where to mount. 120mm or more of space between the wall
and the PULL CORD side of the rack is necessary in order for the rack to
fit.
Since the PULL CORD is suspending, it is recommended to mount the
PULL CORD side of the rack towards the wall so that it is not hindering.
②
On the PULL CORD side of the rack, mount the SMALL BASE with a
fastener (not included)
(
Use a fastener that is suitable for the the ceiling
joist.
)
③
Open up 1,000-1,240mm of space from the SMALL BASE and mount the
BIG BASE with a fastener (not included)
④
Slide through the tip of the BODY of the rack through the BIG BASE.
⑤
Slide the channel of the BODY through the SMALL BASE.
⑥
Align the SMALL BASE to the countersink hole, then secure the BASE of
the PULL CORD to the BODY with the COUNTERSUNK SCREW included.
⑦
Set the BASE parallel to the surface, then secure the BIG and SMALL BASE
with the ANGEL ADJUSTING SCREW.
⑧
Attach the CAP. Push on the cap until the channel of the BODY is covered.
⑨
Attach the PULL CORD HOOK onto the PULL CORD.
⑩
Check if the rack operates correctly.
•Make sure that there is no rattle from loose screws.
•Check operations by elevating and lowering the pole via the PULL
CORD.
BIG BASE
SMALL BASE
Rafter Mount Installation
Setting Up The TURN NUT
⑥
⑦
③
②
④
⑤
①
⑧
⑨
900
〜
1240
Over 120mm
60
60
WALL
Big
Small
BIG BASE
SMALL BASE
SMALL BASE
BIG BASE
Part Name
Part Image Quantity
4
4
For Wooden Structures: Item Number/DRY-10-12
φ
6
×
75 cross-head
hexagon coach screw
Flat washer
Part Name
Part Image Quantity
4
4
For Terrace Rafters: Item Number/DRY-06-11
Rafter
Base
Turn Nut Screw
※
Not able to mount in some cases due to the type of rafter
M5 Use Turn Nut
M5
×
20truss head screw
③
④
①
②
■
Parts List for Different Types of Structures
(
OPTIONAL
)
Hole
※
1
※
1
The BIG and SMALL BASE are
structured differently.
The PULL CORD side of the rack is to
be installed onto the SMALL BASE.
※
1
Caution
Can cause injury or damage to property.
③
Mounting Instructions
Sign
Important Matter
Hazards
・
Damages