Shandong Taishan Sports Equipment Co.,Ltd
Web : www.taishansports.cn
Installation:
Packing list:
Installation steps:
1) Place the column on a level and firm ground for easy installation;
2) As shown in the figure below, assemble A-beam with 1-fixed rod and C-ring
on 2-hanging bolt set Just get stuck at the groove;
A Beam assembly
1pcs
D Middle support welding
2pcs
B Upper support welding
2pcs
C Ring ring assembly
2pcs
F Rope part
4pcs
E Lower support part
2pcs