![TAG MCLAREN AUDIO AV192R Manufacturing Instructions Download Page 4](http://html.mh-extra.com/html/tag-mclaren-audio/av192r/av192r_manufacturing-instructions_813570004.webp)
MANUFACTURING INSTRUCTIONS
MI-10459T Rev01
DAB fitting
Manufacturing Instructions:
Team Affected
CELL
Y:\design\Manufacturing Instructions\AVP MIs\MI-10459T Rev01.wpd
.
Page 4 of 5
30
DAB aerial cable assembly
Ensure that the two large washers are fitted to
the connector before inserting this into the
chassis.
Fit shake proof washer and nut on outside to
retain in position
When tightening nut of connector be careful
not to damage the silkscreen legend of the
chassis
35
Cable tie
Attach cable tie base in position shown and
tie the aerial cable in position. Cut off excess
from cable tie.
40
DAB connection
Feed the aerial cable into the gap below the
display board and plug the connector into the
DAB module.