
2
13/10/2016
A Ground Breaking Company Since 1923
Contents
Page
Introduction
3
Safety
4
Safe Operating Procedures
5
Maintenance
6
Storage
6
Removing the End Tow
6
Getting the Drill ready for the first time
6
Understanding Calibration
7
Calibration
7
Drilling Speed
7
Setting the Sowing Depth
7
Drill Operation
8
End of Day
8
Removing the Sponge Bar Assemblies
8
Fitting the Sponge Bar Assemblies
9
Bolted Connections
9
Tyre Pressure
10
Stand
10
Maintenance
11
Notes
12
Warranty Certificate
13