59
Removal Procedure
Removal Procedure
7.Remove axial
fl
ow blad
Remove the nut
fi
xing the blade and then remove the
axial
fl
ow blade.
Axial
fl
ow blade
Procedure
Note
6. Remove right side plate
Remove connection screws connecting the right
side plate with the valve support and the electric
box. Then remove the right side plate.
Right side plate
Electric box assy
8. Remove electric box assy
Remove screws
fi
xing the electric box assy;
loosen the wire bundle and unplug the wiring
terminals. Then lift the electric box to remove it.
Reactor
Remove Reactor
Take off the
fi
xed scre,and you could take
off the reactor.
Motor
Remove motor
Remove tapping screws
fi
xing the motor
anddisconnect the leading wire insert of the
motor. Then remove the motor.
Summary of Contents for SUV2-H18/1CFA-N
Page 3: ...Summary and Features Outdoor Unit SUV2 H18 1CFA N SUV3 H24 1CGA N SUV4 H28 1CGA N...
Page 4: ...SUV4 H36 1CKA N SUV5 H42 1CKA N...
Page 18: ...14 Schematic Diagram Schematic Diagram SUV2 H18 1CFA N SUV3 H24 1CGA N...
Page 35: ...31 Exploded Views and Parts List Exploded Views and Parts List Model SUV3 H24 1CGA N...
Page 37: ...33 Troubleshooting Troubleshooting Model SUV4 H28 1CGA N...
Page 39: ...35 Troubleshooting Troubleshooting Model SUV4 H36 1CKA N...
Page 42: ...38 Troubleshooting Troubleshooting Model SUV5 H42 1CKA N...
Page 67: ...TADIRAN INTERNATIONAL...