Wiring the External Boiler Pump (Optional)

Using a 3/16 inch female spade connector, connect the hot side of the boiler pump circuit to the male spade connector labelled

“Pmp” located on the back of the RMC circuit board. Connect the neutral side of the boiler pump circuit to the neutral (N) side of the

RMB’s input power supply. When using this option the line cord should be removed and the RMB hard wired.

Wiring the Heat Demand (Required)

The Heat Demand circuit can be wired using either a powered signal or an unpowered switch closure.

Powered Demand

If a powered demand is being used, connect the switched side of the 24 V (ac) demand

circuit to the “Heat Dem” terminal of the terminal block. Connect the second side of the

24 V (ac) demand circuit to the “Com” terminal of the terminal block.

Unpowered Demand

If an unpowered demand is being used, connect one side of the demand switch to the

“Heat Dem” terminal of the terminal block. Connect the second side of demand switch

to the “Com” of the terminal block.

Wiring the Boiler

Begin by removing the two (2) pin plug-in terminal block from the RMC’s circuit board. To

do this, pull the terminal block directly away from the circuit board.

The Boiler Relay is a switch that is to be used in the boiler circuit. There is no power

available on these terminals from the RMC. Connect the Boiler relay in series with the

control circuit of the boiler.

S

 

   

 

 

 

 

 

     

 

 

 

 

 

     

 

   

 

 

 

 

 

 

   

 

   

     

 

 

 

   

     

 

     

 

 

 

 

 

   

 

 

   

 

 

   

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

   

 

 

 

 

 

   

 

 

   

 

 

 

   

 

 

   

 

 

 

   

 

 

   

   

 

 

Com Heat

Dem

Boil Out

Sys

Ret

Com

Com Sup

   

 

 

 

 

 

   

 

   

 

 

   

 

 

 

 

 

   

 

   

 

 

     

 

 

 

 

 

 

 

     

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

   

 

 

 

 

 

 

   

   

 

 

 

 

   

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

   

 

 

 

 

 

 

   

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

   

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

   

 

 

 

 

 

   

   

 

 

   

 

 

 

 

 

   

 

 

 

 

 

 

 

 

   

 

 

 

   

 

 

 

 

 

   

 

   

 

 

 

 

 

 

 

   

 

 

 

   

 

   

   

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

   

 

     

 

 

 

   

 

   

 

 

 

 

 

   

     

 

   

 

 

 

   

 

 

 

 

 

 

   

   

 

 

   

 

 

   

 

 

 

   

 

   

 

 

 

 

   

 

 

   

 

 

   

 

 

 

 

 

 

   

 

 

 

   

 

 

 

 

   

 

 

     

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

     

 

       

   

 

 

 

     

   

 

 

 

 

 

 

 

 

   

 

 

 

   

 

STEP FOUR - RECONNECTING THE TERMINAL BLOCKS

Insert the eight (8) pin plug-in terminal block into the eight (8) pin terminal header on the RMC circuit board. Press firmly until it snaps

into place.

Insert the two (2) pin plug-in terminal block into the two (2) pin terminal header on the RMC circuit board. Press firmly until it snaps into

place.

STEP FIVE - MOUNTING THE RMC

• Begin by pushing all excesses wiring back into the Radiant Mixing Block.

• Place the RMC into the Radiant Mixing Block’s plastic enclosure.

• Insert the screw into the hole located on the face of the RMC and tighten the screw to fasten the RMC to the Radiant Mixing Block

Enclosure. Do not overtighten.

STEP SIX - POWERING THE RMC

Apply power to the RMC circuit by plugging in the line cord.

   

POWER UP

On power up, the control displays all segments for 2 seconds followed by the control version

number.

The control then automatically goes to the operating mode and displays either the outdoor

temperature or the mix supply temperature.

Display Operation

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

   

 

 

 

   

   

 

 

   

 

 

 

 

 

 

 

 

 

 

   

 

   

 

 

 

 

   

 

 

 

 

   

 

 

   

 

   

 

 

 

 

 

   

 

 

 

 

   

 

 

 

 

 

   

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

   

 

 

   

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

   

 

 

   

 

 

 

 

 

 

 

 

 

   

 

 

 

   

 

 

   

 

   

 

 

 

 

 

   

 

 

 

 

 

 

 

 

   

 

 

 

   

 

   

   

 

 

         

 

 

   

   

     

   

   

 

 

 

 

   

 

 

 

 

   

 

 

   

 

   

 

 

 

 

 

   

 

   

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

   

 

   

 

 

 

 

 

 

 

 

 

 

 

   

 

   

 

OUT

ROOM

TERM

Cls

MIX

MODE

INDR

T

MINMAX

DEM

VIEW ADJUST

TIME SCHD

F C

%
1

!

MOTR

UNOCC

AMPM

%
2

123

DHW

12

12

DHW

min
hr %

BOIL

SUP

SETP TARG

RET

DIFF MASS

DSGN

STG

MoTuWeThFrSaSu

XCHG

F DLY BST PURG

Opn

WWSD

O

   

 

 

     

 

   

     

 

     

 

 

 

 

 

   

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

   

 

 

 

       

VIEW MENU

To advance to the next available View Item, press and release the ITEM button on the face of the control.

Outdoor Temperature

The outdoor temperature is displayed when the OUTDR element is turned on. This is the

current temperature at the outdoor sensor. The outdoor temperature is only displayed if

an outdoor sensor is installed and the Outdoor Design temperature is not turned off.

Mixing Supply Temperature

The mixing supply temperature is displayed when the MIX SUP elements are turned on.

This is the current temperature at the mixing supply sensor.

M

 

 

 

 

 

   

 

 

 

 

 

 

 

 

     

 

     

 

 

 

 

 

 

 

 

   

 

 

 

   

 

 

   

 

   

 

 

 

 

 

   

 

 

 

 

 

 

 

 

   

 

 

 

   

 

   

   

 

 

         

 

 

   

   

     

   

   

 

 

 

 

   

 

 

 

 

   

 

 

   

 

   

 

 

 

 

 

   

 

   

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

   

 

   

 

 

 

 

 

 

 

 

 

 

 

   

 

   

 

 

OUT

DEM

VIEW

F

%
1

MIX

DEM

VIEW

F

%
1

SUP

Summary of Contents for Radiant Mixing Block

Page 1: ...CEDURE 3 INSTALLATION OF RADIANT MIXING BLOCK 4 OUTDOOR RESET MODE 5 OUTDOOR RESET SETTINGS 5 SETPOINT AND DELTA T MODE 6 SETPOINT AND DELTA T SETTINGS 7 BOILER OPERATION MODE 7 SET UP OF RADIANT MIXING CONTROL 8 DISPLAY OPERATION 11 TROUBLE SHOOTING 13 ERROR MESSAGES 14 REPLACING CARTRIDGE ASSEMBLY 14 REPLACING THE CHECK VALVE 15 TECHNICAL DATA 15 CLEANING 16 LIMITED WARRANTY STATEMENT 16 Plant I...

Page 2: ...2 Typical Piping ...

Page 3: ...a complete injection mixing system Integral to the unit is a variable speed injection circulator constant speed system circulator air elimination and the electronics to drive it all With only four piping connections needed the RMB greatly reduces the time and space required for installation The RMB can be set up to operate as an outdoor reset control a setpoint control or a delta T limiting contro...

Page 4: ...lock Ensure that a proper isolation valve is installed 2 Using proper piping practices connect the return from the radiant heating system to the Radiant Return top right hand connection as indicated on the plastic cover of the Radiant Mixing Block Ensure that a proper isolation valve is installed 3 Using proper piping practices connect the supply from the boiler loop to the Boiler Supply top left ...

Page 5: ...cribed in the Boiler Operation section The RMC also provides boiler protection as described in the Boiler Operation section DEMAND The RMC requires a demand signal before it will begin operation The RMC can use either a powered or an unpowered demand signal Once a demand signal is received the RMC displays the demand pointer in the display and operates as described above Powered Demand The RMC rec...

Page 6: ...rotection as described in the Boiler Operation section DEMAND The RMC requires a demand signal before it will begin operation The RMC can use either a powered or an unpowered demand signal Once a demand signal is received the RMC displays the demand pointer in the display and operates as described above Powered Demand The RMC recognizes a Powered Demand Signal when 24 V ac is applied across the Co...

Page 7: ...he boiler BOILER CONTROL When the RMC controls the boiler the RMC opens and closes the boiler contact in order to control the temperature of the boiler supply water temperature When the RMC is controlling the boiler temperature the RMC will determine the boiler supply water temperature that is required to satisfy the demands of the system The RMC will also determine a differential that is sufficie...

Page 8: ... back off the variable speed injection pump when the boiler temperature drops 1 2 of the Differential below the Boiler Minimum Setting Note If a boiler sensor is not installed the RMC cannot provide boiler protection C CAUTION Improper installation and operation of this product could result in damage to the equipment and possibly personal injury It is your responsibility to ensure that this produc...

Page 9: ...tor from the Radiant Mixing Block to the matching three pin molex connector labelled Var on the back of the RMC circuit board Wiring the Radiant Mixing Block System Pump Connect the system pump s four pin molex connector from the Radiant Mixing Block to the matching four pin molex connector labelled Sys on the back of the RMC circuit board Sys H Pmp Use copper conductors only Power 120 V 10 50 60 ...

Page 10: ...to the eight 8 pin terminal header on the RMC circuit board Press firmly until it snaps into place Insert the two 2 pin plug in terminal block into the two 2 pin terminal header on the RMC circuit board Press firmly until it snaps into place STEP FIVE MOUNTING THE RMC Begin by pushing all excesses wiring back into the Radiant Mixing Block Place the RMC into the Radiant Mixing Block s plastic enclo...

Page 11: ...BOIL DEM VIEW F 1 MIX ADJUST F TARG Delta T Maximum The Delta T Maximum sets the maximum temperature difference between the mixing return sensor and the mixing supply sensor This item is only available if Outdoor Design setting is set to OFF If a mixing return sensor is not installed set this item to OFF Outdoor Design Temperature The Outdoor Design Temperature is the outdoor temperature used in t...

Page 12: ...reased from 0 to 100 over 10 seconds Step Two The variable speed output is decreased from 100 to 0 over 10 seconds Step Three The System Pump is turned on for 10 seconds Step Four The Boiler Contact is turned on After 10 seconds the Boiler Contact and the System Pump contact are turned off The RMC continues normal operation MANUAL OVERRIDE In the event that the RMC fails to operate a manual operat...

Page 13: ...e to read the in stallers settings from its memory The control was forced to load the factory defaults for all settings The control will stop operation until all of the settings in the Adjust menu have been checked O Error Messages VIEW MIX VIEW RET Mixing Return Sensor Short Circuit A short circuit has been detected in the mixing return sensor If the Maximum Delta T setting is set to OFF the con ...

Page 14: ...ss any button on the control MIX VIEW SUP MIX VIEW SUP VIEW BOIL Boiler Sensor Open Circuit An open circuit has been detected in the boiler sensor The boiler contact is operated as if a boiler sensor is not installed The control provides a boiler enable and does not provide boiler pro tection To clear this error message correct the open circuit and press any button on the control If the sensor was...

Page 15: ...rtridge corresponds to the full circulator product number A complete parts list is available from your local plumbing supply wholesaler 7 Reassemble the circulator using the new gasket and bolts supplied 8 Follow the Installation procedure to start up the circulator 1 Disconnect the electrical supply 2 Reduce system pressure to 0 psi and allow system to return to room temperature Isolate the Radia...

Page 16: ...cation the addition of petroleum based fluids or certain chemical additives to the systems or other abuse will not be covered by this warranty If in doubt as to whether a particular substance is suitable for use with a Taco product or part or for any application restrictions consult the applicable Taco instruction sheets or contact Taco at 401 942 8000 Taco reserves the right to provide replacemen...

Reviews: