-3-
Figure 2:
Typical Installation for Hot Water Recirculation Systems
Water
Heater
Recommended Purging Steps:
1. Open fixture at highest point in system
Open all isolation valves
Once system is filled, close the fixture at
the highest point in the system
Close isolation valve on pump discharge
(Option No. 1 location)
Open drain valve on pump discharge until
all remaining air has been purged
Close drain valve
Operate pump until all remaining air is
purged from bearing chamber
2.
3.
4.
5.
6.
7.
Summary of Contents for 007e Series
Page 10: ... 10 NOTES ...
Page 11: ... 11 NOTES ...