TAC Xenta OP Handbook
2 Connection and Basic Functions
2.7
De-installing the OP
If the OP is to be
de-installed
from the network, it should be restored
to the original factory setting to avoid problems, if used in another
network.
Depending on which binding tool has been used, the de-installation is
made according to one of the methods shown below.
2.7.1 Tool: MetraVision
1 Select
OP Service menu – 10. OP mode
and set
Bindable
to “
TAC
” or, in OP version < 3.11, ”
OFF
”.
2 Disconnect the OP electrically from the network.
3 “
Remove
” the OP node from the data base.
Factory setting
If the OP has been labelled
”Unconfig”
, which may happen if step 3
above was executed before step 2, or for any other reason; the OP may
be restored to the factory setting in one of two ways:
A
Reconnect the OP to the network, reinstall it and perform the steps
above in the correct order,
or,
B
use the
Nodutil
program and do the following.
1 Select
OP Service menu – 10. OP mode
and set
Bindable
to “
TAC
” or, in OP version < 3.11, “
OFF
”.
2 Start Nodutil.
3 Press the
Service pin
of the OP.
4 Type “
G
”.
5 Type “
1
”, press Enter.
6 Type “
M
”.
7 Type “
S
”.
8 Type “
C
”.
Summary of Contents for Xenta OP
Page 1: ...TAC Xenta OP Handbook 0 004 7506 4 EN 2001 08 08 AH02 West _STATUS TEMPERATURES ALARMS...
Page 2: ......
Page 32: ...32 36 0 004 7506 4 EN TAC AB 2001 08 08 TAC Xenta OP Handbook 5 Technical data Blank page...
Page 34: ...34 36 0 004 7506 4 EN TAC AB 2001 08 08 TAC Xenta OP Handbook Index Blank page...
Page 35: ......