INSTALLATION
PowerStop Automatic Powerpack
Powerpack Location Options
• Dock Face (A)
Appropriate location when the likelihood of flooding,
snow removal, and damage from transport vehicles is
minimal.
• Under Dock Leveler (B)
When under dock loation is used, ensure Powerpack
is located where it will not interfere with the leveler in
below-dock conditions. The routing of hydraulic and
electrical lines from the Powerpack to the restraint are
best placed through min. 3” PVC (hydraulic) and 3/4”
conduit (electrical) chase during pit construction.
• Inside Building (C)
Locate Powerpack inside where there is minimal
obstruction potential. The routing of hydraulic and
electrical lines from the Powerpack to the restraint are
best placed through min. 3” PVC (hydraulic) and 3/4”
conduit (electrical) chase during pit construction.
See Figure 19 below for example of appropriate PVC
and conduit chase for available mounting methods.
TOLERANCES
(UNLESS OTHERWISE NOTED)
FRACTIONAL:
1/32"
DECIMAL:
.00 =
.01"
.000 =
.005"
ANGULAR:
1
DRAWN BY
CHECKED BY
DRAWING NO.
DATE
BDK
12/1/2017
S Y S T E M S, I N C.
L o a d i n g D o c k E q u i p m e n t
P O W E R A M P
M C G U I R E
D L M
This print is the property of Systems, Inc. and represents a proprietary article in which Systems, Inc. retains any and all patent and other rights, including exclusive rights
of use and/or manufacture and/or sale. Possession of this print does not convey any permission to reproduce, print or manufacture the article or articles shown therein,
such permission to be granted only by written authorization signed by an officer or other authorized agent of Systems,Inc. thereof.
MATERIAL
STOCK NO.
INSTALLATION
OVERVIEW VIEW 4
B
C
Figure 19