background image

SMOKE CONTROL DAMPERS

Round DKIR1 and Rectangular DKIS1

ORIGINAL INSTALLATION, OPERATION AND MAINTENANCE MANUAL

EVERY SMOKE DAMPER NEEDS TO BE INSTALLED IN ACCORDANCE WITH THIS MANUAL!

1396 - CPD - 0058

Summary of Contents for DKIR1

Page 1: ...SMOKE CONTROL DAMPERS Round DKIR1 and Rectangular DKIS1 ORIGINAL INSTALLATION OPERATION AND MAINTENANCE MANUAL EVERY SMOKE DAMPER NEEDS TO BE INSTALLED IN ACCORDANCE WITH THIS MANUAL 1396 CPD 0058 ...

Page 2: ...ion of several actuators possible Power consumption and switching thresholds must be observed S1 S2 S3 S4 S5 S6 3 87 3 2 1 N L 1 Note Supply via safety isolation transformer Parallel connection of several actuators possible Power consumption and switching thresholds must be observed S1 S2 S3 S4 S5 S6 3 87 3 2 1 N L 1 S1 S2 S3 S4 S5 S6 3 87 3 2 1 T Application with the SBSE Control damper control a...

Page 3: ...rs hereafter dampers circular DKIR1 and rectangular DKIS1 the products of Systemair It contains basic information and recommendations regarding the installation use and inspections that need to be followed to ensure proper and smooth operation of the dampers Resistance class E600 120 ved i o S500C10000 AA single is valid for all nominal dimensions of round dampers see Fig 8 and for nominal dimensi...

Page 4: ...inspection and repairs Distance between dampers and building structures distribution technology and ventilation equipment must be large enough for reliable performance of the installation functional testing inspection and repair The distance between the dampers must be at least 200 mm according to EN 1366 10 The distance between dampers and the wall or ceiling must be at least 200 mm according to ...

Page 5: ...24 months starting on the date of product shipment by an exceptional agreement this period can be up to 30 months starting on the date of shipment 2 The product is tested in the production factory before the shipment The producer guarantees that the product features shall be in accordance with the related technical standards during the whole warranty period assuming that the customer uses it in a ...

Page 6: ...of the following inspection after deficiencies elimination Inspection technician s signature Periodic damper inspection at least once in 12 months Date Description of found defects and date of the following inspection after deficiencies elimination Inspection technician s signature OPERATING DIARY ...

Page 7: ...S1 PP 52_201504 7 8 Periodic damper inspections at least once in 12 months Date Description of found defects and date of the following inspection after deficiencies elimination Inspection technician s signature ...

Page 8: ...nkovo 146 Slovakia 1396 CPD 0058 EN 12101 8 Smoke damper round DKIR1 DN rectangular DKIS1 WxH Operational reliability cycling 10 200 cycles passed Fire resistance E600120 ved i o S500C10000AAsingle or E600120 ved i o S1500C10000AAsingle see the page 3 maintenan of t cross section under E integrity E 600 C smoke leakage S 500 Pa and 1500 Pa see the page 3 mechanical stability under E cross section ...

Reviews:

Related manuals for DKIR1