Page 14
4.3 External Water Circuit
The flow switch and the filter water, although not in-
cluded in the supply, must always be fitted such as
plant components.
Their installation is mandatory for warranty.
The external water circuit shall guarantee a
constant water flow rate through the circulat-
ing refrigerant/water heat exchanger (evap-
orator) under steady operating conditions
and in case of a load variation.
The circuit shall be composed by the following ele-
ments:
n
A circulation pump which can ensure the necessary
flow rate and head.
n
The total content of the primary water circuit shall
never be lower than 2.5 lt/kW in terms of refriger-
ating capacity. If the total water volume in the pri-
mary circuit should be unable to reach such a value,
an additional heat-insulated storage tank should be
installed. This tank is intended to avoid any repeti-
tive start of the compressor.
n
A membrane expansion tank complete with a safety
valve and a drain which shall be visible.
The expansion tank shall be dimensioned in
such a way that it can absorb a 2% expan-
sion of the total volume of the water in the
plant (exchanger, pipelines, uses and stor-
age tank, if available). The expansion tank
shall never be insulated when the circulating
fluid is not flowing through it.
A differential pressure switch is mounted as a stand-
ard. It will stop the unit whenever it senses a load loss
through the heat exchanger which may result in a flow
rate problem.
In addition:
n
Install on/off valves (accessory) on the lines at the
inlet and outlet of the manifolds of the exchangers
(evaporator).
n
Arrange a by-pass complete with an on/off valve
between the manifolds of the heat exchangers.
n
Arrange air vent valves at the high points of the wa-
ter lines.
n
Arrange drain points complete with plugs, clocks,
etc. in the proximity of the low points of the water
lines.
n
Insulate the water lines to prevent the heat from
blowing back into the unit.
WARNING
NOTE
Installation
RECOMMENDED WATER COMPOSITION
PH
7,5 - 9
Electrical conductivity
10 - 500
μS/cm
Total hardness
4,5 - 8,5
dH
Temperature
< 60
[°C]
Alkalinity (HCO
3
-
)
70-300
ppm
Alkalinity / Sulphates (HCO
3
-
/ SO
4
2-
)
> 1
ppm
Sulphates (SO
4
2-
)
< 70
ppm
Chlorides (Cl
-
)
< 50
ppm
Free Chlorine
< 0,5
ppm
Phosphates (PO
4
3-
)
< 2
ppm
Ammonia (NH
3
)
< 0,5
ppm
Ammonium Ion (NH
4
+
)
< 2
ppm
Manganese Ion (Mn
2+
)
< 0,05
ppm
Free Carbon Dioxide (CO
2
)
< 5
ppm
Hydrogen Sufide (H
2
S)
< 0,05
ppm
Oxygen Content
< 0,1
ppm
Nitrates (NO
3
-
)
< 100
ppm
Manganese (Mn)
< 0,1
ppm
Iron (Fe)
< 0,2
ppm
Aluminium (Al)
< 0,2
ppm
Caution
If the water circuit is to be drained for a time exceeding one month, the
circuit must be fully charged with nitrogen to prevent any risk of corrosion
by differential venting