![Synergy NSC CONTENDER Instruction Manual Download Page 43](http://html1.mh-extra.com/html/synergy/nsc-contender/nsc-contender_instruction-manual_1420742043.webp)
610-150 Main Shaft Collar
610-140 N5 Main Shaft
100-261 M2.5x10 Socket Head
Bolts used for pinching do not need loctite
Crown & Main Gear Installation
Main Gear Assembly and Crown
Gear Assembly are inserted into
the frames together in this step.
After installation, gently press down on Main
Shaft while lifting up on Main Shaft Collar and
tighten 2.5x10mm Main Shaft Collar bolt.
A39
Summary of Contents for NSC CONTENDER
Page 1: ......
Page 12: ...Servo Tray Installation Do not fully tighten screws A8 100 306 M3x6 Socket Head ...
Page 55: ...Elevator Linkage X2 A51 Approx 58 50mm 107 100 Ball Link 107 078 78mm Rod 107 100 Ball Link ...
Page 56: ...Aileron Linkage X2 A52 Approx 107mm 107 100 Ball Link 107 100 Ball Link 107 126 126mm Rod ...
Page 57: ...Pitch Servo Linkage A53 Approx 83mm 107 100 Ball Link 107 100 Ball Link 107 102 102mm Rod X2 ...
Page 61: ...412 1270 ...