![Synergy E7SE Assembly Instructions Manual Download Page 27](http://html1.mh-extra.com/html/synergy/e7se/e7se_assembly-instructions-manual_1420737027.webp)
305-140 E5/7 Main Shaft
320-411 Jesus Bolt Collar
100-351 Nylock Nut
100-320A M3x20 Special Bolt
100-325A M3x25 Special Bolt
Main Gear / Spur Gear Install
IMPORTANT!
Ensure boss is facing up when
installing the Jesus Bolt Collar!
IMPORTANT!
- Shouldered bolts should not be tightened
with force. It is possible to stress the shouldered bolt!
109-110 10mm Main Shaft Shim(optional)
Optional -
Use 10mm shim if there is
excessive up/down play
in the main shaft
Page 25
WWW.SYNERGYRCHELICOPTERS.COM