6. CYLINDER HEAD/VALVE
6-15
Install cam chain on to sprocket and align the
timing mark on the sprocket with that of cylinder
head.
Align sprocket bolt hole with camshaft bolt hole.
Tighten the sprocket mounting bolts.
Caution
Make sure timing marks are matched.
Install cylinder head side cover (3 bolts).
Install thermostat (2 bolts).
Loosen auto tensioner adjustment bolt and
remove bolt and spring.
Install tensioner and install spring and adjustment
bolt.
Install cylinder cover (4 bolts).
4 bolts
To this chapter contents
2 bolts
Timing mark
3 bolts
Tensioner adjustment bolt
Thermostat bolts
Summary of Contents for Quad Lander 300
Page 1: ...FORWARD CONTENTS HOW TO USE THIS MANUAL SERIAL NUMBER Quad Lander 300 SERVICE MANUAL...
Page 5: ...Home page Contents SERIAL NUMBER Frame number Engine number...
Page 17: ...1 GENERAL INFORMATION 1 12...
Page 41: ...2 MAINTENANCE INFORMATION 2 17...
Page 49: ...3 LUBRICATION SYSTEM 3 8 Notes To this chapter contents...
Page 51: ...4 FUEL SYSTEM 4 2 UA30A A UA30A1 6 Fuel tank cap Fuel tank Carburetor Fuel valve Fuel Strainer...
Page 69: ...4 FUEL SYSTEM 4 20 Notes To this chapter contents...
Page 144: ...10 ALTERNATOR STARTING CLUTCH 10 10 Note To this chapter contents...
Page 178: ...13 BODY COVER 13 14...
Page 192: ...14 FRONT BRAKE FRONT WHEEL 14 14 Notes To this chapter contents...
Page 213: ...16 REAR BRAKE REAR WHEEL REAR CUSHION 16 11...
Page 242: ...17 ELECTRICAL SYSTEM 17 21 To this chapter contents...
Page 243: ...18 ELECTRICAL DIAGRAM 18 1 18 Home page Contents QUAD LANDER 300 ELECTRICAL DIAGRAM...
Page 244: ...18 ELECTRICAL DIAGRAM 18 2 Notes Home page Contents...