![SwitchDoc Labs SolarMAX2 Assembly And Testing Manual Download Page 29](http://html1.mh-extra.com/html/switchdoc-labs/solarmax2/solarmax2_assembly-and-testing-manual_1415589029.webp)
Connect your 12 V Lead Acid Battery
Step 1)
If you have selected the recommended 12 V Lead Acid battery (
), then place
it into the Bud Box as shown. Positive terminal up. Use Velcro to hold the heavy battery in place. It fits
snugly into place.
Step 2)
Slide the Yellow Spade connector (connected to the wire which is connected to the “-“ terminal on the
Solar Controller (Part D) 12V BATIN “-“ screw down terminal) on the
Negative
Spade on the 12 V Battery
(CHECK YOUR WORK!!!!)
Step 3)
Slide the Red Spade connector (connected to the Yellow Wire which is connected to the IN1+ screw
terminal on the IN3221A (Part C) board onto the
Positive
spade on the 12 V Battery (Make sure you do this
right!).
Page
27
Version 1.1 September 2021
Summary of Contents for SolarMAX2
Page 3: ...Errat a Page 1 Version 1 1 September 2021 ...
Page 9: ...Page 7 Version 1 1 September 2021 ...
Page 18: ...Now we move on to the wiring of the SolarMAX2 Page 16 Version 1 1 September 2021 ...
Page 23: ...Page 21 Version 1 1 September 2021 ...
Page 24: ...This completes the Grove Wiring for SolarMAX2 Page 22 Version 1 1 September 2021 ...
Page 26: ...Fully Wired SolarMAX2 for Reference Page 24 Version 1 1 September 2021 ...