![SwitchDoc Labs SolarMAX2 Assembly And Testing Manual Download Page 14](http://html1.mh-extra.com/html/switchdoc-labs/solarmax2/solarmax2_assembly-and-testing-manual_1415589014.webp)
Step 2)
Drill 3 1” holes in the front of the lower part of the box. Separate the holes by at least 2 inches, center
to center. (Two vent holes and one hole for the Part F- USB Weatherproof Plug.
Step 3)
Insert Part E - USB Weatherproof Plug into the BUD Box, with the cap on the outside in the rightmost
1” hole. Screw down. If you are using a large capacity Lead Acid Battery, put the cap in the leftmost 1” hole.
Page
12
Version 1.1 September 2021
Summary of Contents for SolarMAX2
Page 3: ...Errat a Page 1 Version 1 1 September 2021 ...
Page 9: ...Page 7 Version 1 1 September 2021 ...
Page 18: ...Now we move on to the wiring of the SolarMAX2 Page 16 Version 1 1 September 2021 ...
Page 23: ...Page 21 Version 1 1 September 2021 ...
Page 24: ...This completes the Grove Wiring for SolarMAX2 Page 22 Version 1 1 September 2021 ...
Page 26: ...Fully Wired SolarMAX2 for Reference Page 24 Version 1 1 September 2021 ...