www.switchdoc.com
Page 18 of 56
February 2020
Step 3 -Attach the Grove OLED Display (B) on to the slot on the left of the OurWeather Base
Plat (Q) using two small screws and nuts (E). Feel free to glue the board on if you can’t get the
screws and nuts on the board.
Step 4 – Attach the WiFi Antenna (C) to the OurWeather Base (Q) from the bottom (removing
the Red cap if present) and attach it to the Base using the brass nut and screw. Route the wire
up through the “O” in the SwitchDoc Labs Logo on the OurWeather Base (Q). Screw on the
black antenna on the connector from the top of the OurWeather Base as shown below.
Summary of Contents for Our Weather
Page 1: ...www switchdoc com Page 1 of 56 February 2020 Assembly and Operation Manual February 2020 ...
Page 3: ...www switchdoc com Page 3 of 56 February 2020 ...
Page 4: ...www switchdoc com Page 4 of 56 February 2020 ...
Page 6: ...www switchdoc com Page 6 of 56 February 2020 B Grove OLED Display ...
Page 7: ...www switchdoc com Page 7 of 56 February 2020 C WiFi Antenna ...
Page 11: ...www switchdoc com Page 11 of 56 February 2020 I Rain Bucket J Wind Speed Anemometer ...
Page 12: ...www switchdoc com Page 12 of 56 February 2020 K Rain Gauge Mounting Assembly L Wire Ties ...
Page 15: ...www switchdoc com Page 15 of 56 February 2020 Q OurWeather Base Stand ...
Page 16: ...www switchdoc com Page 16 of 56 February 2020 R WeatherPlus2 Computer Board ...
Page 19: ...www switchdoc com Page 19 of 56 February 2020 ...
Page 55: ...www switchdoc com Page 55 of 56 February 2020 ...