SL-400.OPE
3-1
07/2009
OPERATING INSTRUCTIONS
During all operations of the SwapLoader, the speed of the engine should be maintained at 1,000
to 1,200 RPM, assuming the ratio of the Power Take Off is about 100%.
LOADING A CONTAINER
1.
Engage the P.T.O. (Refer to P.T.O. manual for operation).
2.
Retract the jib (right control lever backward). Then, tilt the arm backward (left control
lever backward).
3.
Make sure the work area in front of the container is clear of people and obstacles. Move
the truck backwards until the hook engages the curved lifting bar of the container.
NEVER EXTEND THE JIB
to reach the proper catching height, rather tilt the arm.
RAISE/UNLOAD
LOWER/LOAD
JIB
RETRACT
EXTEND
LIFT
FRONT
Summary of Contents for SL-400
Page 1: ...Model SL 400 Parts and Operations Manual Hoist Serial Number ____________________ ...
Page 2: ......
Page 4: ......
Page 8: ......
Page 10: ......
Page 11: ...INTRODUCTION ...
Page 12: ......
Page 19: ...INTRODUCTION 1 7 09 2009 90P52 PROP DECAL OPTIONAL 90P78 HIGH PRESSURE FLUID ...
Page 20: ......
Page 21: ...INSTALLATION ...
Page 22: ......
Page 48: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 63: ...Page 3 of 7 28JUL09 ...
Page 65: ......
Page 66: ......
Page 67: ...Page 7 of 7 28JUL09 ...
Page 68: ......
Page 73: ...10 05 09 REAR LIGHT BAR ASSEMBLY 51H68 ...
Page 76: ...10 05 09 ...
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 83: ...OPERATION ...
Page 84: ......
Page 93: ...MAINTENANCE ...
Page 94: ......
Page 96: ...SL 400 MAI 4 2 07 2009 ...
Page 108: ......
Page 109: ...PARTS LIST ...
Page 110: ......
Page 111: ...42H05 REV D SL 400 BASE HOIST ASSEMBLY W FIXED JIB ...
Page 116: ......
Page 117: ......
Page 118: ......
Page 124: ......
Page 125: ...OPTIONS ...
Page 126: ......
Page 130: ...90H69 REV B SL 330 400 406 AIR CONTROL ASS Y 3 SECTION ...
Page 134: ...43H08 REV C SL 330 400 JIB ASSEMBLY ADJUSTABLE ...
Page 135: ......