
SL-400.INS
2-25
09/2009
Note: Prior to any welding, consult the truck manufacturer for any special
precautions that may need to be taken. Typically the batteries must be disconnected
and the ground lead from the welder should be connected as close as possible to the
part being welded to avoid the possibility of arching across bearings, gears, etc.
Note: The hoist mainframe is made from high strength low alloy steel. Use an
appropriate welding process.
4.
Install the hydraulic adapters and hoses from the three section hydraulic control valve to
the hydraulic cylinder (Pt. No. 21P84) shown on drawings 42H62 & 90H83 in the Option
section of the manual. Tie up all loose hoses as required. Be sure the hoses are routed to
avoid exhaust components and all moving components of the rear axles.
5.
After the start procedure has been completed on the hoist, verify that the movement of
each control lever corresponds to the movement of the cylinders per the figure below.
Operate the stabilizer through 5 to 8 cycles to remove the air from the hydraulic cylinders
and lines.
RAISE/UNLOAD
LOWER/LOAD
JIB
RETRACT
EXTEND
LIFT
FRONT
RAISE
LOWER
Summary of Contents for SL-400
Page 1: ...Model SL 400 Parts and Operations Manual Hoist Serial Number ____________________ ...
Page 2: ......
Page 4: ......
Page 8: ......
Page 10: ......
Page 11: ...INTRODUCTION ...
Page 12: ......
Page 19: ...INTRODUCTION 1 7 09 2009 90P52 PROP DECAL OPTIONAL 90P78 HIGH PRESSURE FLUID ...
Page 20: ......
Page 21: ...INSTALLATION ...
Page 22: ......
Page 48: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 63: ...Page 3 of 7 28JUL09 ...
Page 65: ......
Page 66: ......
Page 67: ...Page 7 of 7 28JUL09 ...
Page 68: ......
Page 73: ...10 05 09 REAR LIGHT BAR ASSEMBLY 51H68 ...
Page 76: ...10 05 09 ...
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 83: ...OPERATION ...
Page 84: ......
Page 93: ...MAINTENANCE ...
Page 94: ......
Page 96: ...SL 400 MAI 4 2 07 2009 ...
Page 108: ......
Page 109: ...PARTS LIST ...
Page 110: ......
Page 111: ...42H05 REV D SL 400 BASE HOIST ASSEMBLY W FIXED JIB ...
Page 116: ......
Page 117: ......
Page 118: ......
Page 124: ......
Page 125: ...OPTIONS ...
Page 126: ......
Page 130: ...90H69 REV B SL 330 400 406 AIR CONTROL ASS Y 3 SECTION ...
Page 134: ...43H08 REV C SL 330 400 JIB ASSEMBLY ADJUSTABLE ...
Page 135: ......