5-20
CHASSIS
• Tighten the steering shaft nut to the specified torque and new
cotter pin.
!
Steering shaft lower nut: 29 N.m (2.9 kgf.m, 2.1 lb-ft)
• Tighten the steering shaft holder bolts to the specified torque
and new cotter pins.
!
Steering shaft holder bolt: 23 N.m (2.3 kgf.m, 16.5 lb-ft)
TIE-ROD
• When installing the tie-rod, make sure that the narrow side
1
of the tie-rod comes outside.
NOTE:
The lock nuts
2
2
2
2
2
have left-hand threads.
• Tighten the tie-rod end nut to the specified torque and install
new cotter pin.
!
Tie-rod end nut: 29 N.m (2.9 kgf.m, 21 lb-ft)
HANDLEBAR
• Tighten the handlebar clamp bolts temporarily.
• Set the handlebars to mutch its dent mark to the mating sur-
face between handlebar clamps as shown. Tighten the handle-
bar clamp bolts to the specified torque.
!
Handlebar clamp bolt: 13 N.m (1.3 kgf.m, 9.5 lb-ft)
Outside
Inside
Outside
Inside