
6-8 POWER UNIT
INSTALLATION
Installation in reverse order of removal paying special attention
to the following steps.
1. Before installing cylinder head gasket, apply bond to both
surfaces of the hatched areas shown in illustration.
99000-31140: SUZUKI BOND “1207B”
2. Insert the dowel pins
1
and place a new cylinder head gas-
ket
2
into position on cylinder.
3. Position cylinder head assembly on cylinder.
4. Apply engine oil to cylinder head bolts.
5. Lightly seat all cylinder head bolts at first.
According to tightening order in figure, tighten bolts in two
steps.
Cylinder head bolt:
1st step
7 N·m (0.7 kg-m, 5.0 lb-ft)
Final step
13 N·m (1.3 kg-m, 9.5 lb-ft)
Do not re-use gasket. Always use a new gasket.
1
2
3
4
5
Summary of Contents for DF 25
Page 1: ...99500 97J00 01E Printed in Japan TK K6 9 9 5 0 0 9 7 J 0 0 0 1 E ...
Page 87: ...POWER UNIT 6 21 17 Remove a screw S and the reed valve T ...
Page 147: ...Prepared by Service Department May 2006 Manual No 99500 97J00 01E Printed in Japan 148 ...
Page 148: ...99500 97J00 01E Printed in Japan TK K6 9 9 5 0 0 9 7 J 0 0 0 1 E ...